Now accepting guest editorial from SAP, Oracle, Workday and ServiceNow practitioners.Pitch a guide
The Sign-Off Table

Academy · Manufacturing (Plan-to-Produce) · 300 Professional

Manufacturing Changes from SAP ECC to SAP S/4HANA

Explains the manufacturing simplifications a system conversion from SAP ECC brings: MRP Live and the classic MRP, MRP areas replacing storage location MRP, mandatory production versions, simplified sourcing, embedded PP/DS, and the reports and extensions these changes break. Closes with a plan-to-produce regression plan and sign-off criteria for the converted process.

  • 51 minutes
  • 5 lessons + quiz
  • Manufacturing Practitioner, Key User, Process Owner