Where the authoritative dates live and how to verify them

10 min

Listen to this lesson

0:00 / 18:29

Most of the dates in this course were misquoted somewhere in 2025 or 2026: by a vendor selling a migration, by a slide copied from a 2019 deck, or by a news article that summarized a summary. SAP itself changes terms, as the December 2025 Compatibility Scope update and the October 2026 transition-option update show. A deadline map is only as good as its sources, so this lesson shows where each kind of date lives and how to check it.

The source hierarchy

1. Your contractWhat you actually bought: licenses, subscription, extended maintenance agreement
2. SAP Notes2269324 (Compatibility Scope), 3591251 (transition option), 52505 (support after end of maintenance), 1648480 (Business Suite 7 and NetWeaver)
3. Product Availability MatrixMainstream and extended dates per product version
4. SAP Support Portal and SAP NewsMaintenance strategy pages and official announcements
5. Analysts, partners, pressContext only; never the only source for a date
Use the highest layer you can reach; lower layers point you to the higher ones.
The Sign-Off Table · thesignofftable.com/academy/sap-s4t-104
Date you needWhere to checkWhat to record
ECC and Business Suite 7 maintenanceSAP News, February 2020 announcement; SAP Note 1648480; PAM entry for SAP ERP 6.0EHP level, phase, end date, note version
Support after maintenance endsSAP Note 52505What customer-specific maintenance includes
Transition optionSAP Note 3591251; SAP Support Portal page on the ERP private edition maintenance strategy; SAP News update of October 13, 2026Eligible products, prerequisites, term
Compatibility ScopeSAP Note 2269324 and its matrix attachmentItem ID, alternative, use-right end for your contract type
Solution ManagerSAP Support Portal page for SAP Solution Manager 7.2Mainstream date and the functions covered by extended maintenance
PI/PO, BW, BPC, SCM, GTSPAM (support.sap.com/pam) for the exact product versionVersion, mainstream date, extended date
SAP S/4HANA release maintenancePAM entry for your release; release strategy pagesEnd of mainstream for your release

Where each kind of date lives. The PAM and SAP Notes need an S-user.

A verification routine

  1. Write the claim exactly, for example "BW 7.5 mainstream maintenance ends December 31, 2027".
  2. Identify the precise product version in use from the system (System > Status, component list), not from a diagram.
  3. Look up that version in the PAM and note the mainstream and extended dates.
  4. Check the relevant SAP Note and record its version number and date; notes are updated in place.
  5. Compare with your contract: is extended maintenance or a subscription in force?
  6. Record the result in the date register with the source, version, date checked and who checked it.
  7. Set a review date, at least every six months and after every SAP announcement.
Contoso's routine joins system facts, SAP sources and the contract before a date enters the register.
The Sign-Off Table · thesignofftable.com/academy/sap-s4t-104
A date enters the register only when the version, the SAP source and the contract agree; otherwise it is marked unverified.
The Sign-Off Table · thesignofftable.com/academy/sap-s4t-104

Common traps when quoting dates

TrapExampleHow to avoid it
Product family instead of version"BPC ends in 2027" when BPC 10.1, 11.1 and 2021 have different datesAlways look up the exact version in the PAM
Old slide, new termsA 2023 deck still says compatibility packs end in 2025Check the current version of the SAP Note and its change date
Headline year without type"Solution Manager ends 2027" without saying which functions get extended maintenanceRecord the date type and scope with every date
Vendor date treated as SAP dateA vendor blog says LO-VC ends in 2027Find the statement in an SAP Note, the PAM or an SAP page, or label it unverified
Contract ignoredAssuming the longer cloud-subscription date for an on-premise licenseConfirm the contract type with the account team

Five ways a correct-looking date ends up wrong in a steering pack.

Also note what this course could not settle from public sources, and say so in your own register. Sources disagree on the newest BPC version's mainstream date and on LO-VC beyond the S/4HANA simplification list. (GTS 11.0 is now settled: SAP offered no extended maintenance, and from January 1, 2026 it is in customer-specific maintenance.) "Unverified, check with SAP" is a perfectly good register entry. A confident wrong date is not.

The date register

Grace keeps the register as a simple table in SAP Cloud ALM next to the program's risks, so every date has an owner and a review date. A row looks like this:

FieldExample: Contoso BW row
Product and versionSAP BW 7.5 (illustrative course data)
Date typeMainstream maintenance end; extended optional
DatesDecember 31, 2027; extended to December 31, 2030 if contracted
SourcePAM entry and SAP NetWeaver 7.5 maintenance strategy; checked by Sam
Contract positionNo extended maintenance contracted
Successor decisionUnder evaluation: BW/4HANA versus SAP Datasphere
Next reviewSix months, or on any SAP announcement

One row of Contoso's date register.

What would you do?

A partner deck shown to Contoso's steering group says "BPC ends 2027, migrate to our planning product now". Contoso runs BPC 10.1 for NetWeaver for consolidation, and a sister company runs BPC 2021 for BW/4HANA. Dan asks whether the slide is right for either. What do you do?

Key points
  • Contract first, then SAP Notes and the PAM, then SAP pages and news; analysts are context only.
  • Key notes: 2269324, 3591251, 52505 and 1648480; record their version because notes change in place.
  • Look up the exact product version from the system, not from a diagram.
  • Keep a date register with source, checker and a review date.

Check your understanding · not graded

Lesson check

  1. 1. What does SAP Note 52505 describe?

  2. 2. Where do you look up the dates for a specific product version?

  3. 3. Why record the version of an SAP Note in the register?

  4. 4. What answers "what do we actually use" for compatibility items?