Lesson 4 of 6
The satellite clocks: PI/PO, Solution Manager, BW 7.5, APO, BPC, GTS 11, LO-VC
11 min
Listen to this lesson
ECC rarely runs alone. Around it sit an integration hub, an ALM platform, a data warehouse, perhaps a planning system and a trade compliance system. Several of these are built on SAP NetWeaver 7.5 or belong to SAP Business Suite 7, so they share the 2027 / 2030 pattern. Others have their own dates, and some headlines are simply wrong. This lesson is the one-page reference.
| Product | Clock (verify for your release and contract) | Successor SAP points to | Academy course |
|---|---|---|---|
| SAP Process Orchestration 7.5 (PI/PO) | Mainstream to end of 2027; extended maintenance to end of 2030 at the same conditions as Business Suite 7 | SAP Integration Suite | sap-int-301, sap-pim-301 |
| SAP Solution Manager 7.2 | Mainstream to end of 2027; to 2030 only with Business Suite 7 extended maintenance, and only for listed functions | SAP Cloud ALM (SAP Focused Run for large operations) | sap-alm-302, sap-alm-304 |
| SAP BW 7.5 | Mainstream to end of 2027; optional extended to end of 2030 | SAP BW/4HANA (SAP aligned it to at least 2040), or SAP Datasphere / Business Data Cloud | Planned Data & Analytics track |
| SAP SCM 7.0 (APO), EHP 2-4 | Mainstream to end of 2027; optional extended to end of 2030 | SAP IBP; embedded PP/DS in SAP S/4HANA for detailed scheduling | Planned Supply Chain track |
| SAP BPC 10.1, version for SAP NetWeaver | Mainstream to end of 2027; optional extended to end of 2030 | BPC on SAP BW/4HANA, SAP Analytics Cloud planning, SAP S/4HANA Group Reporting | Planned Group Reporting course |
| SAP GTS 11.0 | Mainstream ended December 31, 2025 | SAP Global Trade Services, edition for SAP HANA | Planned GTS course |
| Classic variant configuration (LO-VC) | No separate date in SAP S/4HANA: still available on-premise and Private Edition, subject to the simplification list; in ECC it follows the ECC clock | Advanced Variant Configuration (AVC); Public Edition supports AVC only | sap-pp-301 |
The satellite clocks around an ECC landscape.
Three clocks with a twist
Solution Manager. SAP's support page says mainstream maintenance for Solution Manager 7.2 runs to the end of 2027, and customers who take extended maintenance for SAP Business Suite 7 get Solution Manager extended maintenance at no extra cost. But that extended scope covers only requirements management, project management, process management, the test suite, change control, IT service management and landscape management. Monitoring and other functions fall to customer-specific maintenance. SAP recommends moving to SAP Cloud ALM before the end of 2027, and notes that SAP Focused Run has its own maintenance terms.
BPC. There are several BPC versions with different dates. SAP's 2023 timeline blog lists BPC 10.1 for NetWeaver at the end of 2027 (with optional extended maintenance to 2030), BPC 11.1 for BW/4HANA 2.0 at the end of 2024, and BPC 2021 tied to the BW/4HANA 2021 maintenance in the PAM. Sources disagree on the newer versions, which is exactly why the deadline map must cite the PAM entry, not an article.
LO-VC. Some vendor articles say classic variant configuration "ends in 2027". That date is ECC's. In SAP S/4HANA on-premise and Private Edition, LO-VC remains available subject to simplification items, while SAP's new development goes into Advanced Variant Configuration. Treat LO-VC to AVC as a strategic move with a big regression risk, not as a 2027 deadline, and verify the status for your release.
The testing problem differs by satellite. Interfaces can be compared message by message. Reports in a new data warehouse can be reconciled number by number. Planning results from IBP or embedded PP/DS will never match APO exactly, because the algorithms differ, so their tests compare plans within agreed tolerances and judge whether the new plan is acceptable. Plan that kind of test early, because agreeing tolerances with planners takes longer than running the test.
Contoso's satellite inventory
Contoso's landscape has several satellites on a 2027 clock. Process Orchestration on XP1 runs 64 integrated configurations that move to SAP Integration Suite in waves after hypercare. Solution Manager 7.2 runs ChaRM for the ECC systems ED1, EQ1 and EP1, while the S/4HANA program already runs in SAP Cloud ALM. APO SP1 (SCM 7.0 EHP 4) is still connected to CMP by CIF after the conversion; SAP IBP (planning area CMCPA01) goes live in mid-2027, and APO is switched off before the end of 2027. BW 7.5 on SAP HANA (BWD / BWQ / BWP) feeds sales and margin reporting; BW/4HANA versus Datasphere and SAP Business Data Cloud is under evaluation. Consolidation runs in BPC 10.1 for NetWeaver and moves to Group Reporting. GTS 11.0 (GD1 / GQ1 / GP1) is already past its mainstream date. Classic variant configuration survives in one corner: the CMC-ALT-900 family, 14 LO-VC models at Chicago 1720, carried over unchanged by the conversion, with the AVC transformation planned as a later project. CMC-ALT-100 is not configurable, and CMC-ALT-240 is made to order without variant configuration.
What would you do?
Theo says: "Solution Manager is fine until 2030; we have extended maintenance for ECC." Contoso's ECC run team uses Solution Manager for ChaRM and for interface and job monitoring. What is the correct response?
- PI/PO 7.5, BW 7.5, SCM 7.0 and BPC 10.1 for NetWeaver: mainstream to end of 2027, optional extended to end of 2030.
- Solution Manager 7.2 extended maintenance to 2030 covers only listed functions; monitoring is not one of them.
- GTS 11.0 left mainstream maintenance at the end of 2025.
- LO-VC has no separate S/4HANA deadline; AVC is the strategic successor and Public Edition uses AVC only.
Check your understanding · not graded
Lesson check
1. Which Solution Manager function is outside its extended maintenance scope?
2. What is the successor SAP points to for SAP GTS 11.0?
3. What is accurate about LO-VC in SAP S/4HANA Private Edition?
4. Which pair shares the 2027 mainstream and 2030 extended pattern?