Course quiz

The SAP 2027-2030 Deadline Map: ECC, Compatibility Scope, PI/PO, Solution Manager, BW, APO, BPC and LO-VC

Keep this: job aid

SAP deadline map checklist

  • Label every date: mainstream, extended, customer-specific or use right.
  • ERP 6.0 EHP 0-5: mainstream ended end of 2025. EHP 6-8: mainstream to end of 2027, paid extended to end of 2030.
  • Transition option: ERP private edition on SAP HANA before end of 2030; subscriptions may run to end of 2035 (SAP Note 3591251).
  • Compatibility Scope (Note 2269324): on-premise ended May 31, 2026; selected CS, LE-TRA, PP-PI items to end of 2030; cloud subscriptions (RISE) longer (check the note for the current date).
  • PI/PO 7.5, BW 7.5, SCM 7.0, BPC 10.1 NW: mainstream to end of 2027, extended to end of 2030. GTS 11.0 mainstream ended 2025.
  • Solution Manager 7.2: extended to 2030 only with Business Suite 7 extended maintenance, and not for monitoring.
  • LO-VC: no separate S/4HANA deadline; AVC is strategic; Public Edition is AVC only.
  • Verify: system component list, PAM, SAP Note version, contract; record checker and date.
  • Sequence: use rights first, earliest clock next, one migration per process per quarter, six months of buffer.
  • Decommission only after the comparison test is signed and the baseline archived.