Signavio is only worth its cost if findings change something: a fit-to-standard decision, a KPI with a target, a fixed control, an updated model, a better test scope. This lesson gives the process owner a routine for turning findings into decisions, connecting the suite to sap-pow-202 (fit-to-standard) and sap-pow-302 (KPIs).

Classify each finding

Finding classExample at Contoso (illustrative)Typical decision
Master dataRotor price differences from outdated purchasing info recordsData correction plus a data quality rule
ConfigurationTolerance for price differences tighter in 1710 than 1810Align configuration through change control
Behavior and trainingPurchase orders created after the invoiceTraining and a KPI on after-the-fact orders
Design gapApproval skipped above threshold for one cost centerFix workflow or authorization; add control test
OpportunityInnovation recommendation for invoice automationEvaluate in fit-to-standard; plan and test

Each class of finding leads to a different kind of decision.

Every finding is validated, classified, decided and then measured again through a KPI.
The Sign-Off Table · thesignofftable.com/academy/sap-pow-306

Findings in fit-to-standard

In fit-to-standard workshops, mining findings replace opinions with numbers. When a key user says "we always need a custom step here", the owner can ask how many cases actually take that path. For Wave 2, when Contoso brings Alternadores del Norte into company code 1910, Lucía's order-to-cash workshops face a gap: Alternadores runs a non-SAP legacy ERP, so Process Insights, which is built for SAP data, cannot analyze it. Process Intelligence could, if its event data is extracted, but that is a license and effort decision. The cheaper evidence is Contoso's own SAP S/4HANA order-to-cash variants, which show which standard paths already serve a similar business, plus the legacy system's own reports on order volumes and exceptions.

  • Bring the top variants and their volumes to the workshop, not the full map.
  • For each requested deviation from standard, ask for the share of cases and the value it affects.
  • Record decisions with the evidence that supported them, so they can be revisited.
  • Mark findings that become requirements, so they can be traced to tests in SAP Cloud ALM.

Findings also protect the standard. When a team asks for an extension to handle "a common exception", the owner can check whether the exception is common at all, and whether the standard path would handle most cases if a data or configuration problem were fixed first. Many requested extensions turn out to be workarounds for a finding that has a cheaper fix, which keeps the core clean, as sap-pow-202 recommends.

From findings to KPIs

KPIBaseline (illustrative)TargetMeasured inOwner
Supplier invoices posted without manual intervention, 171058%70% within two quartersProcess Insights, then embedded analyticsDan
Invoices paid after due date, 17109%Below 5%Process Insights or SAP S/4HANA analyticsDan, with Ana's team
Invoices above threshold without approval14% of those cases0%Conformance, then a control test each quarterDan and Nadia

Illustrative course data: KPIs that came from Dan's findings, each with baseline, target, source and owner.

A finding becomes a decision, a test, a monitored KPI and a later re-measurement.
The Sign-Off Table · thesignofftable.com/academy/sap-pow-306
LaterLow value, high effort: redesign of a rare path
PlanHigh value, high effort: invoice automation capability
BatchLow value, low effort: small data clean-ups
Do nowHigh value, low effort: info record prices for rotors; approval workflow fix
Dan prioritizes findings by value (from value analysis and mining) and effort.
The Sign-Off Table · thesignofftable.com/academy/sap-pow-306

Value analysis in Process Insights and volumes from mining give the value axis; the solution architect and process experts give the effort axis. A finding that is valuable and cheap is done in the next release. A valuable but expensive one becomes a roadmap item with a business case. Recording the prioritization, with numbers, protects the owner when someone asks later why one improvement came before another.

The loop closes in three places that other courses cover. The testers use the same variants to scope regression (sap-tst-311). The run team monitors the operational KPIs in SAP Cloud ALM (sap-alm-304). And the model in the Collaboration Hub is updated whenever a decision changes how the process should work, so the next person who reads it sees the improved process, not the old one.

What would you do?

Process Insights shows that 9% of Detroit supplier invoices are paid late. The AP team blames late approvals; purchasing blames missing goods receipts. Dan has one meeting to decide. What should he bring?

Key points
  • Validate, then classify findings: data, configuration, behavior, design or opportunity.
  • Use variant volumes and values to decide deviations in fit-to-standard.
  • Turn findings into KPIs with baseline, target, source and owner.
  • Close the loop through tests, monitoring and updated models.

Check your understanding · not graded

Lesson check

  1. 1. What should a fit-to-standard workshop bring from mining?

  2. 2. Which finding class calls for a control test?

  3. 3. When is a finding closed?

  4. 4. What should happen to the model when a decision changes the process?