Migrating from ChaRM processes

10 min

Contoso's ECC support team has used ChaRM in SAP Solution Manager 7.2 for years. The S/4HANA program started in Cloud ALM. After go-live, the ECC landscape goes away, and so does the reason to keep ChaRM. SAP's transition page states that Solution Manager mainstream maintenance ends on 31 December 2027 and recommends finishing the move before then. This lesson turns that into a plan.

Map practices, not screens

SAP's transition material maps a ChaRM change document to a Cloud ALM feature, and a continuous cycle to a deployment plan with system groups. It also says ChaRM workflows and change documents are not migrated. So the migration is a process redesign, not a data load. Start from the practices your auditors rely on and give each one a home.

ChaRM practiceCloud ALM practiceGap to manage
Request for change approved by the change advisory boardRequirement approval plus Luis’s weekly feature reviewBoard decisions recorded on the requirement or feature
Normal change document through cycle phasesFeature through statuses within a releasePhase locks become release freeze dates
Urgent change documentFeature tagged urgent in the emergency releaseProcedure defines the path; review recorded
Status-dependent importsStatus-dependent transport actions and production gate at Ready for ProductionSimilar control; fewer statuses
Cross-system object lock and retrofitTransport checks; retrofit handled by procedurePlan for parallel landscapes explicitly
Mapping ChaRM practices to Cloud ALM practices and naming the gaps.
The Sign-Off Table · thesignofftable.com/academy/sap-rel-301

A migration plan

  1. Month 1InventorySAP Readiness Check for SAP Cloud ALM; list document types, approvals and reports in use
  2. Month 2DesignWrite the Cloud ALM change procedure: paths, approvals, evidence, roles
  3. Month 3Set upTransport management per managed system, system groups, deployment plan, projects, roles
  4. Month 4PilotOne low-risk landscape on Cloud ALM; three-tier and four-tier flows tested
  5. Month 5Cut overFreeze new ChaRM documents; finish or close open ones; switch
  6. AfterRetireArchive ChaRM records for retention; decommission Solution Manager functions
A practical sequence for moving a support organization from ChaRM to Cloud ALM.
The Sign-Off Table · thesignofftable.com/academy/sap-rel-301

Handling work in flight

The riskiest moment is the switch. Changes in flight must finish in one tool. Pick a cut-over date. Before it, stop creating new ChaRM documents. Changes close to production finish in ChaRM; changes still early in development are closed in ChaRM and recreated as features with their transports assigned. Keep a mapping list of old document number to new feature ID so the history can be followed.

  1. Freeze creation of new ChaRM change documents from the cut-over date.
  2. Classify open documents: finish in ChaRM, or close and recreate as a feature.
  3. Recreate features with the same transports assigned and the old document number in the description.
  4. Train approvers on where their approval now happens, and test that the roles are set correctly.
  5. Tell the auditors before the switch, and show them the new evidence path on a sample change.

People and roles

SAP's transition material suggests assigning four personas in the new model: developer, tester, change manager and deployment manager, and restricting transport actions through authorizations and feature IDs. At Contoso that maps cleanly: Kenji's developers, Priya's testers, Luis as change manager and Sam as deployment manager. The ChaRM-era roles such as "IT operator" or "change advisory board member" do not exist as such; their duties move into these personas or into the procedure.

Change manager (Luis)Owns the procedure; approves Ready for Production; chairs the weekly review
Deployment manager (Sam)Runs and monitors imports; confirms deployments; handles failures
Tester (Priya’s team, key users)Executes linked test cases; records evidence; signs off Successfully Tested
Developer (Kenji’s team)Builds in CMD on transports created from features; releases tasks
The four personas at Contoso after the move from ChaRM.
The Sign-Off Table · thesignofftable.com/academy/sap-rel-301

What would you do?

On cut-over day, Contoso has 30 open ChaRM normal changes. Twelve are in test, eighteen are still in development. What should Luis plan?

Key points
  • Migration from ChaRM is a process redesign; documents and workflows do not migrate.
  • Change document maps to feature; continuous cycle to deployment plan and system groups.
  • Pilot with a low-risk landscape, then cut over on a fixed date with a freeze on new ChaRM documents.
  • Keep a mapping of old documents to new features and retain ChaRM history for audit.

Check your understanding · not graded

Lesson check

  1. 1. Which tool helps you inventory current Solution Manager usage before migrating?

  2. 2. What is the recommended handling for an open ChaRM change still in early development at cut-over?

  3. 3. What does a ChaRM phase lock typically become in a Cloud ALM process?