Now accepting guest editorial from SAP, Oracle, Workday and ServiceNow practitioners.Pitch a guide
The Sign-Off Table

Lesson 2 of 5

Planning strategies

9 min

Listen to this lesson

0:00 / 5:21

A planning strategy answers one question: how do forecasts and customer orders work together for this product? SAP Learning describes strategies as numeric codes for approaches to production planning, grouped into make-to-stock, subassembly planning and make-to-order. The strategy is selected through the strategy group in the MRP 3 view of the product, per plant.

StrategyCategoryPIRs?Sales ordersTypical use
10 Net requirements planningMake-to-stockYesNot planning-relevant; served from stock; PIRs reduced at goods issueMass production, low-cost items
40 Planning with final assemblyMake-to-stockYesConsume PIRs; excess over PIRs is planned tooForecastable finished products with customer orders
50 Planning without final assemblySubassembly planningYes (for the finished product)Trigger final assembly; components ready in advanceShort delivery time, final assembly varies
20 Make-to-orderMake-to-orderNoEach order planned and stocked separatelyCustomer-specific products
Four strategies every PP practitioner should know. SAP delivers more; check which your project activates.
The Sign-Off Table · thesignofftable.com/academy/sap-pp-202

Make-to-stock: 10 and 40

With strategy 10, the demand program is set up without reference to sales orders. SAP Learning describes the behavior: sales orders are filled from stock and do not enter planning, and PIRs are reduced when goods are issued for the delivery, oldest first. It suits products sold from the shelf in volume, where individual orders do not change the plan.

Strategy 40, planning with final assembly, is the most common make-to-stock strategy for products with real customer orders. PIRs trigger procurement and production ahead of demand. Incoming sales orders consume the PIRs, so demand is not counted twice. If customer orders exceed the forecast, the next MRP run plans the extra quantity. The availability check can be run in the sales order. Contoso uses strategy group 40 for CMC-ALT-100 in plant 1710.

With strategy 40 an order first eats into the forecast; only the part the forecast can't cover adds to what MRP plans.
The Sign-Off Table · thesignofftable.com/academy/sap-pp-202

Make-to-order: 20 and 50

With strategy 20, nothing is produced until a sales order arrives, and PIRs are not used for the finished product. SAP Learning explains that each sales order is planned in its own individual customer segment, lot-for-lot, and the resulting stock belongs to that order and cannot be used for another. Costs can be tracked per sales order item.

Strategy 50, planning without final assembly, sits in between. PIRs for the finished product create planned orders of a special type (VP) that plan components and assemblies but cannot be converted into production orders. When the sales order arrives, it consumes the PIR and final assembly starts. The components are already there, so lead time shrinks to final assembly time.

Strategy 50 builds the components on the forecast and waits for the customer before final assembly, so lead time after the order is only final assembly time.
The Sign-Off Table · thesignofftable.com/academy/sap-pp-202
Strategy 10Accurate forecast, standard product, orders served from stock
Strategy 40Forecast reasonable, standard product, orders consume forecast
Strategy 20Hard to forecast, customer-specific product, build per order
Strategy 50Components forecastable, final assembly per order
A rough guide to choosing a strategy. Real choices also weigh lead time, stock risk and costing needs.
The Sign-Off Table · thesignofftable.com/academy/sap-pp-202

How the strategy is chosen

The strategy group in MRP 3 points to a main strategy (and optionally alternatives). The strategy determines the requirements types for PIRs and sales orders, and through them the requirements classes that control consumption, availability check and whether a separate segment is used. An MRP group can also carry consumption settings; per SAP Learning, if both exist, the strategy group values win. For assemblies, the individual/collective indicator in MRP 4 decides whether they are planned per sales order or collectively.

What would you do?

Maria wants fleet orders for the standard alternator delivered from stock, but planners want each order to reduce the forecast so they do not over-produce. Which strategy fits best?

Key points
  • The strategy group in MRP 3 selects the planning strategy per product and plant.
  • Strategy 10: orders served from stock, PIRs reduced at goods issue. Strategy 40: orders consume PIRs.
  • Strategy 20: no PIRs; each sales order planned and stocked in its own segment.
  • Strategy 50: VP planned orders prepare components; final assembly starts with the sales order.

Check your understanding · not graded

Lesson check

  1. 1. Where is the strategy group maintained?

  2. 2. Under strategy 10, when are PIRs reduced?

  3. 3. What is special about VP planned orders under strategy 50?

  4. 4. Under strategy 20, where is a sales order planned?