Now accepting guest editorial from SAP, Oracle, Workday and ServiceNow practitioners.Pitch a guide
The Sign-Off Table

Lesson 1 of 5

Plan, target and actual costs on orders

11 min

Listen to this lesson

0:00 / 6:41

A production order is a cost object. From the moment it is released, it collects the cost of making a batch of product: components issued from stock, labor and machine time confirmed on operations, overhead, external processing. At the end of each period controlling has to answer three questions about every order: what is still in progress (work in process), what was finished and why did it cost more or less than standard (variances), and where do those values belong in the books (settlement). This course works through all three with one Contoso order.

The running example: production order 1001200 for 500 alternators CMC-ALT-100 at plant 1710 Detroit. The released standard cost is USD 150 per unit, built in the product costing course: material 80, material overhead 8, labor 26, machine 24, production overhead 12.

Order 1001200 spans two closes: in June its balance is WIP, in July it is delivered and the balance becomes a variance that settlement clears.
The Sign-Off Table · thesignofftable.com/academy/sap-co-301

Product cost by order or by period

SAP S/4HANA supports two main ways of controlling manufacturing costs. SAP's learning material contrasts them clearly. Product cost by order treats each order as the cost object, with full settlement; WIP is valued at actual cost and the order status decides whether WIP or variances are calculated, so variances appear only when the order is finished. Product cost by period uses a product cost collector for repetitive production; WIP and variances are calculated every period at target cost. Contoso uses product cost by order for alternators, so this course follows that path.

Product cost by orderProduct cost by period
Cost objectEach production or process orderProduct cost collector per material and plant
Settlement typeFull settlement (FUL)Periodic settlement (PER)
WIP valued atActual costsTarget costs
VariancesWhen the order is delivered or technically completedEvery period
Typical useDiscrete batches, such as Contoso's alternator ordersRepetitive, continuous production
Product cost by order versus product cost by period, as described in SAP's learning material.
The Sign-Off Table · thesignofftable.com/academy/sap-co-301

Three kinds of cost

  • Plan costs: calculated when the order is created or released (preliminary costing), from the order's own BOM and routing for the planned quantity. For order 1001200 that is 500 × 150 = USD 75,000 if the order matches the standard exactly.
  • Target costs: what the delivered quantity should have cost, usually from the standard cost estimate. If 480 units are delivered, target costs are 480 × 150 = USD 72,000.
  • Actual costs: what was really posted: goods issues of components, confirmed activities, overhead calculated at period-end, external invoices.
Actual costsGoods issues, confirmations, overhead, external processing: what happened
Target costsStandard cost × delivered quantity: what should have happened
Plan costsPreliminary costing of the order at creation: what the order expected
CreditsGoods receipts of finished product into stock at standard price
The cost layers on a production order.
The Sign-Off Table · thesignofftable.com/academy/sap-co-301

Statuses that drive period-end

The order status decides what period-end does. While an order is released and not yet finished, its balance is work in process. Once it is delivered (status DLV, after final goods receipt) or technically completed (TECO), the balance is no longer WIP but a variance. SAP's material on WIP states that WIP is calculated until the order is delivered or technically completed. A partially delivered order (PDLV) still counts as in process.

In product cost by order, the status at period-end decides whether the order balance is treated as WIP or as a variance.
The Sign-Off Table · thesignofftable.com/academy/sap-co-301
  1. Day 1Released (REL)Components can be issued and operations confirmed; costs accumulate
  2. During productionPartially delivered (PDLV)Some finished units received into stock; balance is still WIP
  3. Final receiptDelivered (DLV)Variance calculation and full settlement become possible
  4. Or by decisionTechnically completed (TECO)Order finished without full delivery; balance becomes variance
  5. After settlementClosedBalance zero; no further postings
Order statuses and what they mean for period-end.
The Sign-Off Table · thesignofftable.com/academy/sap-co-301

Reading the order cost report

Every analysis starts with the order's cost report, which shows plan, actual and target by cost element or cost component, with goods receipt credits as a separate line. In SAP GUI it is reached from the order display or with an order analysis transaction such as KKBC_ORD; in SAP Fiori, production cost analysis apps show the same comparison. Check your role's catalog for the app names in your release. Read it top to bottom: are the material lines close to plan? Are the activity hours as expected? Has overhead been calculated yet this period?

What would you do?

On June 30, order 1001200 shows actual costs of USD 61,200 and goods receipt credits of USD 30,000 for 200 units. The order is partially delivered. Grace asks whether the USD 31,200 balance is a variance. What is the right answer?

Key points
  • Production orders collect actual costs; goods receipts credit them at standard price.
  • Plan = preliminary costing; target = standard × delivered quantity; actual = what posted.
  • In product cost by order, open orders carry WIP; finished orders (DLV or TECO) carry variances.
  • Calculate overhead before WIP and variances.

Check your understanding · not graded

Lesson check

  1. 1. What are target costs on a production order?

  2. 2. In product cost by order, what is the balance of a released, partially delivered order at period-end?

  3. 3. Which settlement type does product cost by order use?

  4. 4. Why calculate overhead before WIP and variances?