CISQ puts the 2022 US cost of poor software quality at $2.41 trillion, and 63% of organizations deploy code without fully testing it (Tricentis, 2025).

Compiled by Matt Angerer
24 sources · 9 min read

Defect cost numbers circulate widely, but they come from very different evidence: national economic models, vendor surveys, older engineering studies and ERP outcome surveys. This roundup separates them, dates each figure and flags where sources disagree. Every number links to the page where we found it.

Key takeaways

$2.41 trillion

Estimated annual US cost of poor software quality, 2022 (CISQ estimate)

Source: CISQ, 2022

63%

Of organizations deploy code without fully testing it (vendor survey, 2025)

Source: Tricentis Quality Transformation Report, 2025

90%

Of the most serious production issues traced to technology- and system-level software flaws (CISQ)

Source: CISQ technical guidance, undated page

50.6%

Of 170 ERP projects finished on budget (survey data collected January 2025 to January 2026)

Source: Panorama Consulting 2026 ERP Report, as reported by Xorosoft

The national cost of poor software quality

The largest figures are macro estimates, and they are useful for framing a business case rather than pricing a single defect. CISQ's 2022 update estimates that the cost of poor software quality in the US has grown to at least $2.41 trillion. A secondary breakdown of that estimate places $1.81 trillion in operational software failures, $0.52 trillion in legacy system maintenance and technical debt, and $0.26 trillion in unsuccessful development projects, with the categories overlapping. Accumulated technical debt is separately put at about $1.52 trillion.

Earlier CISQ editions produced different totals, and the methods changed between them. The 2018 report put the cost at approximately $2.8 trillion, which CISQ described as a rough aggregate of public material. The 2020 report concluded that poor quality software cost the US upwards of $2.08 trillion. The three figures should not be read as a trend line.

2018 (rough aggregate)$2.8T
2020 report$2.08T
2022 report$2.41T

Source: CISQ, 2018; CISQ, 2020; CISQ, 2022. Bars use the 2018 figure as the 100% reference. Methods differ between editions.

The most-cited government study is older. A 2002 NIST planning report estimated the annual national costs of an inadequate software testing infrastructure at $59.5 billion (historical). Its feasible-improvement estimate was lower: a potential cost reduction of $22.2 billion from feasible infrastructure improvements. More than half of these costs were borne by software users, not developers.

Annual cost, inadequate testing infrastructure (2002)$59.5B
Potential reduction from feasible improvements (2002)$22.2B

Source: NIST Planning Report 02-3, 2002 (historical). Bar widths scale to the $59.5B figure.

Tricentis's Software Fail Watch is a news-based sample, not a cost census. Its 2018 release covered 2017 events and reported that 606 failures affected over 3.6 billion people and caused $1.7 trillion in lost revenue. A later analysis of that sample notes that the sample is not a census of routine bugs, so use it for severe-incident framing only.

What a defect costs by the phase where it is found

The phase-based cost curve is the most-repeated defect statistic, and it rests on older engineering data. A NASA study of error cost escalation set the cost of a requirements error fixed in the requirements phase at 1 unit. It found that the cost to fix that error rises to 3 to 8 units in design, 7 to 16 units in the build phase, and 21 to 78 units in integration and test. In operations, the same requirements error ranged from 29 units to more than 1500 units.

Requirements phase (1 unit)1
Design (lower bound of 3 to 8)3
Build (lower bound of 7 to 16)7
Integration and test (lower bound of 21 to 78)21
Operations (lower bound of 29 to more than 1,500)29

Source: NASA, Error Cost Escalation Through the Project Life Cycle (historical; publication year not shown in the record). Bars show lower bounds only, on a relative-unit scale.

Secondary write-ups attribute similar curves to IBM Systems Sciences Institute research, but they disagree on the multipliers. One source puts the multiplier at roughly 6.5x in design, 15x in testing and 100x in production. Another says fixing a defect discovered in production costs 15x to 100x more than fixing the same defect during the requirements or design phase. We could not retrieve the original IBM study, so treat the IBM multipliers as unverified.

Testing gaps and exposure to defects

The 2025 Tricentis Quality Transformation Report is vendor-sponsored survey data. It found that nearly two-thirds (63%) of organizations deploy code without fully testing it, and over 8 in 10 (81%) report financial impacts from software defects exceeding $500k annually.

Deploy code without fully testing it63%
Report defect-related impact above $500k a year81%

Source: Tricentis Quality Transformation Report, 2025 (vendor data, as reported by Silicon Canals).

  • In the UK manufacturing segment of the same Tricentis research, 53% estimate that poor software quality costs their businesses between GBP 390,000 and GBP 773,000 annually, and nearly a third (30%) place their annual losses at over GBP 773,000.
  • Tricentis also reports that six in ten UK manufacturers expect to experience major software outages in the next twelve months (2025, vendor data).
  • A NIST-commissioned study from 2002 noted that even though 50 percent of software development budgets go to testing, flaws in software still cost the U.S. economy $59.5 billion annually (historical).

ERP program outcomes and where defects show up

Panorama Consulting's 2026 ERP Report is the most recent ERP outcome survey we could find, but we could only access it through secondary write-ups. It covers 170 organizations, with data gathered between January 2025 and January 2026. The reported median project timeline was nine months.

  • Around 50.6% finished on budget, and another 19.4% cost less than expected.
  • 30% of Panorama respondents finished above the budget they expected.
  • Data issues were reported by 29.4% of over-budget companies and 36.8% of companies that ran late.
  • Among respondents with delayed projects, 57.9% pointed to business or team issues, and scope growth came next at 55.3%.
50.6%
30%

Source: Panorama Consulting 2026 ERP Report, as reported by Xorosoft. The two rings are independent shares, not a complete split.

The 2024 and 2025 Panorama editions report different figures, and secondary sources do not agree on the overall failure rate. One write-up reports that only 32% of ERP implementations were completed on time, and 49% reported operational disruption post-go-live in Panorama's 2024 report. Another cites Panorama Consulting's 2025 research at a 68% overall failure rate. Gartner figures vary too: one source cites between 55% and 75% of ERP projects fail to meet their objectives, while another says more than 70% of ERP projects fail to fully achieve their intended objectives. We could not verify either Gartner statement against a primary report.

Post-go-live quality and hypercare

An SAP-specific figure from a 2025 study of 200 SAP-using organizations, reported secondhand, is the closest we found to an escaped-defect rate. 65% of organizations reported severe-to-very-severe quality issues after go-live in the Horváth 2025 study. The same write-up says that study identified scope expansion, weaknesses in project management, and underestimated testing and data migration phases as the top drivers of delayed go-lives.

65%

Source: Horváth 2025 study, as cited by ITChamps (secondary; primary not retrieved).

  • One practitioner write-up says that during hypercare, issue volume is typically 5 to 10 times higher than steady-state. It cites no primary dataset, so treat this as a rule of thumb.
  • A test-automation vendor claims that more than 90% of SAP enterprise customers opt for this deployment strategy of extended hypercare. This is vendor marketing, not independent research.
  • The same vendor reports that defects reaching production fell by 75% to 95% in its own customer examples. Treat this as a vendor case claim.

AI in quality engineering

The 17th World Quality Report, produced by Capgemini, Sogeti and OpenText, is based on research findings from 2,000 interviews carried out during June and July 2025 by Coleman Parkes Research. Its headline numbers on generative AI are adoption-heavy and scale-light. 89% of responding organizations are piloting or deploying GenAI–augmented workflows, with 37% in production and 52% in pilot phases.

89%
37%

Source: World Quality Report 2025, Capgemini, Sogeti and OpenText.

The same report found that only 15% of respondents have achieved enterprise-wide implementation, while 43% remain in the experimental phase and 30% operate within limited use cases. Barriers to scaling were reported as follows.

Data privacy risks67%
Integration complexity64%
Hallucination and reliability concerns60%
Lack of AI/ML expertise50%

Source: World Quality Report 2025, Capgemini, Sogeti and OpenText. Bars use a 100% scale.

Production data is available but underused. Although 94% of organizations review production data, nearly half struggle to turn insights into actionable strategies for quality enhancement (WQR 2025-26).

Conflicting numbers, flagged

  • CISQ totals: $2.8 trillion (2018), $2.08 trillion (2020) and $2.41 trillion (2022) use different methods. Do not present them as a trend.
  • IBM phase multipliers: secondary sources cite 100x, 15x to 100x, and 6.5x/15x/100x. The original is not verified.
  • Gartner ERP failure: 55% to 75% versus more than 70%, from secondary write-ups that do not link a primary report.
  • Panorama ERP: a 2024 disruption figure of 49% is cited alongside a 51% figure from a roundup with no clear primary. The 2025 failure rate of 68% and the 2026 budget findings measure different things.

Gaps in the public evidence

We did not find a current, independent, SAP-specific measure of defects escaped to production, such as escape rate by module or defect cost per go-live. Most SAP-related figures above come from secondary write-ups or vendor research. Before you use any of them in a business case, go to the primary report and confirm the population, sample size and definition of "failure."

What this means for your sign-off

  • Use the cost curve as a rationale, not a price. The phase multipliers are historical and conflict across sources. Use them to justify earlier test investment, then build your own cost model from your defect log. Start with the phase-by-phase migration testing plan.
  • Put the money where the escapes are. If your first-cycle escapes cluster in a few processes, automate those first. The regression automation guide covers how to rank them.
  • Treat data as a defect source. Panorama-reported delays and overruns cite data issues. Test migrated data in its own cycles, using the approach in test data for S/4HANA.
  • Make the go/no-go decision on evidence. Define defect thresholds and exit criteria before the cutover window. The template library includes a Go/No-Go Readiness Checklist and a UAT Sign-Off Form.
  • Discount vendor hypercare claims. Ask for your own baseline, measured before go-live, and compare hypercare volume against it.

Frequently asked questions

How much more does a production defect cost than one found in requirements?

The NASA study put the operations-phase cost of a requirements error at 29 units to more than 1500 units, relative to 1 unit in the requirements phase (historical). IBM-based multipliers in secondary sources range from about 15x to 100x, so the figure depends on the source.

What is the total cost of poor software quality in the US?

CISQ's 2022 estimate is at least $2.41 trillion. The 2020 edition put it at upwards of $2.08 trillion, so the method changed between editions.

What share of ERP projects go over budget?

In Panorama's 2026 survey, 30% of respondents finished above the budget they expected, and around 50.6% finished on budget. Gartner-based figures in secondary sources are higher, and they measure "failure" more broadly.

How many SAP programs report serious quality problems after go-live?

The Horváth 2025 study, as reported secondhand, found that 65% of organizations reported severe-to-very-severe quality issues after go-live. We could not retrieve the primary report.

Do organizations test all code before deployment?

Tricentis's 2025 vendor survey reports that nearly two-thirds (63%) of organizations deploy code without fully testing it. Treat this as vendor data from a survey of their respondents.

How many organizations are using generative AI in quality engineering?

The World Quality Report 2025 found that 89% of responding organizations are piloting or deploying GenAI–augmented workflows, with 37% in production. Only 15% of respondents have achieved enterprise-wide implementation.

Sources

  1. The Cost of Poor Software Quality in the US: A 2022 Report, CISQ, 2022
  2. The Cost of Poor Software Quality in the US: A 2020 Report, CISQ, 2020
  3. The Cost of Poor Quality Software in the US: A 2018 Report, CISQ, 2018
  4. CISQ Technical Guidance and Report Archive, CISQ, undated
  5. Cost of Defects in Software Testing: 2026 Data and Multipliers, ContextQA, 2026 (secondary; summarizes CISQ)
  6. The Economic Impacts of Inadequate Infrastructure for Software Testing, NIST Planning Report 02-3, NIST, 2002 (historical)
  7. Error Cost Escalation Through the Project Life Cycle, NASA Technical Reports Server (historical)
  8. The Cost of Late Testing: Defect Economics for Enterprise Engineering, TotalShiftLeft, 2026 (secondary; cites IBM Systems Sciences Institute)
  9. Bug Cost and Escape Rate Report, TestDino, 2026 (secondary; cites IBM Systems Sciences Institute)
  10. Tricentis 2025 Quality Transformation Report, as reported by Silicon Canals, Tricentis, 2025 (vendor data)
  11. UK manufacturers face costly software failures amid digital push, Tricentis 2025 Quality Transformation Report, 2025 (vendor data)
  12. Tricentis Software Fail Watch Finds 3.6 Billion People Affected and $1.7 Trillion Revenue Lost, Tricentis, 2018 (covers 2017; vendor data)
  13. The Cost of a Software Bug: 2026 Statistics, Quash, 2026 (secondary; sample caveat for Fail Watch)
  14. World Quality Report 2025: AI adoption surges in Quality Engineering, but enterprise-level scaling remains elusive, Capgemini, Sogeti and OpenText, 2025
  15. World Quality Report 2025 press release, Capgemini, 2025
  16. World Quality Report 17th Edition 2025-26, Sogeti, 2025
  17. World Quality Report 2025-26, Capgemini, 2025
  18. ERP Implementation Statistics 2026: Timelines, Overruns, and Migration Patterns, Xorosoft, 2026 (secondary; reports Panorama Consulting 2026 ERP Report)
  19. ERP Implementation Failure: Why Projects Really Collapse, Cudio, 2025 (secondary; reports Panorama data)
  20. 58 Must-Know ERP Statistics for 2026, Kreative Core Tech, 2026 (secondary; reports Panorama 2025)
  21. ERP Implementation Failures: Stats, Cases and Market Share 2025, Concord ERP, 2025 (secondary)
  22. What Comes After SAP Go-Live, LeapGreat, 2025 (secondary; cites Gartner)
  23. SAP S/4HANA Migration Checklist: 10 Decisions Before Go-Live, ITChamps, 2025 (secondary; cites Horváth 2025)
  24. SAP key users need LiveCompare, not hypercare, Tricentis, 2025 (vendor marketing)

Last updated: November 22, 2026. Statistics are refreshed as new research is published.

More statistics

How this page is made: statistics are gathered from published research with AI-assisted search, every figure is linked to its source, and the page is refreshed as new data is published. Found an error? Tell us.