Lesson 5 of 5

What changed from ECC

10 min

Listen to this lesson

0:00 / 6:22

Contoso is converting from SAP ECC 6.0 EHP 8, so its planners know PP well. The basic objects (PIRs, BOMs, routings, work centers, planned and production orders) carried over. What changed is how planning runs, how planners work, and a few master data rules that a conversion will surface fast.

AreaSAP ECC (Contoso today)SAP S/4HANA (after conversion)
MRP engineClassic MRP (MD01, MD02, MD03) in the application serverMRP Live (MD01N) runs planning logic in the SAP HANA database; classic MRP remains for materials it cannot handle
MRP listSaved MRP list (MD05) as a snapshot of the last runMRP Live does not create MRP lists; planners use the live stock/requirements list
Storage location planningStorage locations could be excluded or planned separatelyPlanning at storage location level is replaced by MRP areas
SubcontractingSubcontractor stock as a special stock segment of the plantSubcontractor MRP areas recommended for separate planning
BOM selectionSeveral BOM selection methodsBOM and routing selected through the production version, so production versions become essential
Planner workplaceMD04, MD06, MD07 in SAP GUISAP Fiori apps: MRP Cockpit, Monitor and Manage Material Coverage, Stock/Requirements List
Advanced planningSeparate SAP APO systemPP/DS embedded in SAP S/4HANA (licensing applies)
The changes planners notice first after a conversion. Exact behavior depends on release; check the simplification list for yours.
The Sign-Off Table · thesignofftable.com/academy/sap-pp-101

MRP Live

MRP Live reads receipts and requirements, calculates shortages and creates planned orders and purchase requisitions inside the database in a single procedure. It is much faster than classic MRP, so planners can run it more often. When a material uses a function MRP Live does not support, the system plans it with classic MRP in the same run. SAP lists these restrictions in SAP Note 1914010, which changes with each release, so check it for yours.

One MRP Live run can plan most materials in the database and quietly hand the rest to classic MRP, so the fallback list is part of the test evidence.
The Sign-Off Table · thesignofftable.com/academy/sap-pp-101

Because MRP Live does not write MRP lists, reports and habits built on MD05 or MD06 lists need a new home. Planners read the stock/requirements list or the Fiori coverage apps, which show the current situation rather than the state at the last run.

Master data rules that bite in a conversion

Two changes surface in every brownfield PP conversion. First, production versions: in SAP S/4HANA, MRP and order creation find the BOM and routing through the production version, so materials that planned fine in ECC without one need a production version before go-live. SAP provides migration reports to create them from valid BOM and routing combinations. Second, MRP areas: planning at storage location level is gone, so storage locations that ECC excluded or planned separately must become storage location MRP areas.

In SAP S/4HANA the production version is the link MRP and order creation use to find the BOM alternative and the routing for a material in a plant.
The Sign-Off Table · thesignofftable.com/academy/sap-pp-101
  1. Does each in-house material have a valid production version?Yes → MRP and order creation can find BOM and routing · No → create versions before mock conversion 1
  2. Did ECC exclude or separately plan any storage location?Yes → design storage location MRP areas · No → plant-level planning only
  3. Do custom MRP reports read MRP lists or ECC planning tables?Yes → rebuild on the stock/requirements view or Fiori apps · No → no action
  4. Do any materials need classic MRP (BAdIs, unsupported functions)?Yes → document them and test both engines · No → MRP Live for all
Conversion readiness questions for plan-to-produce.
The Sign-Off Table · thesignofftable.com/academy/sap-pp-101

Other innovations worth knowing

  • Embedded PP/DS for detailed scheduling and advanced planning, without a separate APO system (licensed separately as SAP S/4HANA Manufacturing for planning and scheduling).
  • Predictive MRP to simulate the effect of demand changes on capacity and suppliers before committing.
  • Demand-driven replenishment to set buffers on decoupling points.
  • In SAP S/4HANA Cloud Public Edition, planners use Fiori apps such as Schedule MRP Runs rather than SAP GUI transactions.

What would you do?

After mock conversion 1, MRP Live in CMQ creates no planned orders for 40 alternator variants that planned fine in ECC. What is the most likely cause to check first?

ECC habitSAP S/4HANA replacementWhat to test
MRP run with MD01 overnight, MRP lists (MD05/MD06) in the morningMRP Live via MD01N or Schedule MRP Runs; coverage apps and MD04Planners find the same shortages without MRP lists
BOM selection method instead of production versions (about 300 Contoso materials)Production versions generated by SAP's migration report before Mock 1Every in-house material plans and creates orders
171S excluded from MRP at storage location levelMRP area for 171S with MRP type NDSpare stock is not counted as available
Creation indicators decide planned order or requisition for bought partsMRP Live creates requisitions (or schedule lines)Buyer hand-off and the $10,000 release still work

Four ECC habits at Contoso and their SAP S/4HANA replacements.

Key points
  • MRP Live runs planning in the SAP HANA database and falls back to classic MRP where it must (SAP Note 1914010).
  • MRP lists are not created; planners use the live stock/requirements list and Fiori coverage apps.
  • Production versions select BOM and routing, and storage location planning moves to MRP areas.
  • Embedded PP/DS, predictive MRP and demand-driven replenishment are available in SAP S/4HANA.

Check your understanding · not graded

Lesson check

  1. 1. Which transaction runs MRP Live?

  2. 2. Why do planners need a new way to review results after moving to MRP Live?

  3. 3. What replaces separate planning of storage locations in SAP S/4HANA?

  4. 4. What does SAP Note 1914010 describe?