Testing sourcing outcomes

8 min

Sourcing tests prove that the right demand reaches the right supplier, at the right price, under the right agreement. The defects they find are expensive and quiet: a contract that is never used, a quota that sends everything to one supplier, a blocked supplier that still gets orders, a price that falls back to the old info record. None of these produce error messages; they just cost money.

Contoso's sourcing test set

TestSetupExpected result and evidence
SR-01 RFQ to awardRFQ with three bidders; award HarborComparison shows landed costs; follow-on contract created with $40.80
SR-02 release orderPO for 600 referencing contract 4600000021Price $40.80 copied; released quantity 600 in release documentation
SR-03 contract targetRelease orders beyond 7,200Message per design (warning) and buyer decision
SR-04 expired contractRequirement dated after validityContract not proposed
SR-05 scheduling agreement via MRPRotor demand in plant 1710Schedule lines in 5500000310 for Lakeside's share
SR-06 releasesME84 or scheduled job after MRPForecast and JIT releases created and output; history visible
SR-07 quota splitSeries of requirements over a monthAllocated quantities approach 70/30
SR-08 blocked sourceManual PO to NorthfieldRefused
SR-09 source list requirementPO to a supplier not on the listRefused
SR-10 ambiguous sourcesTwo valid info records, none fixed, no listRequisition without automatic assignment; buyer chooses

Tests that prove sourcing master data and agreements work together.

Evidence that the expected source was used

For every requisition or PO in a sourcing test, record the supplier, the agreement number and item it references, and the price and its origin (the condition record from the contract or scheduling agreement, not the info record). The PO's item shows the outline agreement reference; the contract's release documentation shows the PO; the quota arrangement shows the updated allocated quantity. Three views that agree are strong evidence.

RequirementMRP requisition or schedule line with assigned source
Purchasing documentPO item with outline agreement and item; price conditions
AgreementRelease documentation or schedule line history shows the call-off
QuotaAllocated quantity increased for the chosen source
Evidence layers for a source determination test.
The Sign-Off Table · thesignofftable.com/academy/sap-mm-301

Testing quotas and dates

Quota tests need a series, not a single requirement. Run MRP on a set of requirements in client 100 (or create requisitions with automatic sourcing) and check the allocated quantities after each step against a hand calculation. Reset or record the quota base quantity first, because existing allocations change the result. Also test the year boundary: create requirements on December 31 and January 1 with the old and new source lists and agreements, and confirm that each day uses the source valid on its date.

  1. Dec 31Old sourcesRequirement uses 2026 Lakeside info record at $42.00
  2. Jan 1New sourcesRequirement uses scheduling agreement 5500000310 at $41.50 or Harbor contract at $40.80 per quota
  3. Jan 2CheckNo requisitions without source; no POs at the old price
  4. Jan 31ReviewSpend with contract reference versus without; quota split for the month
The year-boundary test for Contoso's new rotor sources.
The Sign-Off Table · thesignofftable.com/academy/sap-mm-301

Plan the test data so that each case has exactly one right answer. If client 100 still contains last year's rotor contracts, a leftover Lakeside info record flagged for automatic sourcing, or quota allocations from earlier test cycles, results become hard to read and harder to repeat. Before the sourcing cycle, Priya's team lists every info record, source list entry, quota and agreement for the test products and plants, removes or blocks the leftovers, and records the starting allocations. That list becomes part of the evidence: it shows the conditions under which the expected sources were proven.

What would you do?

SR-02 creates a PO to Harbor for 600 rotors, but the price is $42.00, not $40.80, and the PO item shows no contract reference. What is the most likely cause?

Key points
  • Test RFQ award, release orders, contract limits and expiry, scheduling agreements and releases.
  • Prove the agreement reference and price origin, not just the supplier.
  • Test quotas as a series against a hand calculation; test blocked and unlisted sources.
  • Test the validity boundary when sourcing data changes, especially at year end.

Check your understanding · not graded

Lesson check

  1. 1. What is the strongest evidence that a release order used the contract?

  2. 2. How should a quota arrangement be tested?

  3. 3. Which test proves a blocked source list entry works?

  4. 4. Why test requirements on December 31 and January 1?