Meter-to-cash in SAP S/4HANA Utilities

9 min

Listen to this lesson

0:00 / 6:54

Meter-to-cash is the utility's core process: install a device, read it, turn the reading into consumption, price the consumption by rate, create and print the bill, post it to the customer's contract account, collect the money and chase what is not paid. In SAP S/4HANA Utilities it runs on the same data model IS-U has always used, which is good news for a conversion: the objects testers know stay the same.

The data model

The IS-U data model, unchanged in S/4HANA Utilities: business partner to contract account, contract, installation and devices.
The Sign-Off Table · thesignofftable.com/academy/sap-ind-201
ObjectWhat it representsContoso Detroit example (illustrative)
Business partnerThe customerContoso Motor Co.
Contract accountWhere bills post and payments clear in FI-CAContoso Detroit plant account, payment by bank transfer
ContractThe supply agreement for one division (electricity, water)Electricity contract and water contract
InstallationThe billing-relevant unit: rate category, devices, billing dataIndustrial electricity installation, large general service rate
Premise and connection objectThe place and building servedDetroit plant, building A
Device and registersThe meter and what it measuresInterval meter: energy (kWh) and demand (kW) registers

Meter-to-cash objects with Contoso as Northwind's customer.

The process

  1. ScheduleMeter reading units and billing portions set when each installation is read and billed
  2. Meter readingOrders created; results uploaded or entered (for example EL28) and validated
  3. BillingBilling documents calculated per contract: consumption, rates, operands (EA00 single, EA38 mass)
  4. InvoicingBilling documents combined into a print document with taxes and charges; posted to FI-CA
  5. Bill printBill created and sent by mail, email or portal
  6. CollectionPayments, returns, dunning, installment plans in FI-CA
Meter-to-cash in SAP S/4HANA Utilities.
The Sign-Off Table · thesignofftable.com/academy/sap-ind-201

Billing and invoicing are separate steps on purpose. Billing calculates what each contract owes for a period, using the rate category on the installation and the rates, operands and price levels behind it. Invoicing takes the billing documents of a contract account, adds taxes and other charges, applies budget billing amounts already paid, creates the print document and posts to FI-CA. A defect can sit in either, and the comparison method in lesson 4 must know which.

One billing cycle for Contoso's Detroit plant, from interval data to an open item in FI-CA.
The Sign-Off Table · thesignofftable.com/academy/sap-ind-201

Rates and the worked bill

Contoso's June electricity bill (illustrative) combines an energy charge per kWh, a demand charge per kW of the month's peak, and a fixed customer charge. For 1,840,000 kWh at USD 0.072, a peak of 4,200 kW at USD 14.50 and a USD 350.00 customer charge, billing calculates USD 132,480.00 + USD 60,900.00 + USD 350.00 = USD 193,730.00 before taxes. Each line comes from a different operand and rate step, which is exactly what the comparison must check line by line.

Line (illustrative)QuantityPriceAmount USD
Energy charge1,840,000 kWh0.072 per kWh132,480.00
Demand charge4,200 kW14.50 per kW60,900.00
Customer charge1 month350.00350.00
Total before taxes193,730.00

The Detroit plant's June electricity bill from Northwind.

Convergent Invoicing as an option

In SAP S/4HANA, IS-U billing results can also be passed to SAP Convergent Invoicing as billable items, where they are combined with non-commodity items, such as services or equipment rentals, into one invoice that posts to FI-CA. SAP describes this as an additional option beyond classic IS-U invoicing and bill print. A conversion usually keeps classic invoicing first and evaluates Convergent Invoicing separately, because changing the invoicing path changes every bill's structure at once.

What would you do?

In a test cycle, Contoso's simulated bill shows the right energy charge but a demand charge of zero. Other industrial customers are fine. Where do you look first?

What goes wrong in testing

SymptomUsual causeTest
Estimated bills where actual reads existResults uploaded after the billing run, or failed plausibilityCheck read status before billing in each cycle
Charges missing for a registerRegister not billing-relevant after a device changeTest a device replacement mid-period
Bill does not post to FI-CAInvoicing not run, or account determination errorRun invoicing and check the contract account

Meter-to-cash defects seen in testing.

Budget billing and annual settlement

Many residential customers pay equal monthly budget billing amounts and receive one settlement bill a year. That creates two tests. Each month, FI-CA must request the right budget billing amount and clear it when paid. At the annual bill, invoicing must take the year's consumption charges, subtract the budget billing payments already made, show the balance, and propose new budget billing amounts for the next year. A converted customer whose budget billing plan started in ECC and settles in SAP S/4HANA is the most valuable test case, because it crosses the conversion.

Item (illustrative residential customer)Amount USD
Annual consumption charges and taxes1,488.40
Budget billing paid (12 × 120.00)1,440.00
Balance due on the annual bill48.40
New monthly budget billing amount proposed124.00

An annual settlement with budget billing that started before conversion.

Key points
  • The IS-U data model continues in S/4HANA Utilities: contract account, contract, installation, premise, device.
  • Billing prices consumption by rate; invoicing creates the print document and posts to FI-CA.
  • Convergent Invoicing is an added option, not a forced change.
  • Keep hand-checked golden bills per rate category.

Check your understanding · not graded

Lesson check

  1. 1. Which object carries the rate category and is the billing-relevant unit?

  2. 2. What does invoicing do that billing does not?

  3. 3. 1,840,000 kWh at USD 0.072, 4,200 kW at USD 14.50, plus USD 350. What is the total before taxes?

  4. 4. How does SAP describe Convergent Invoicing for utilities in SAP S/4HANA?