The Sign-Off Table

Lesson 2 of 6

Arrival, unloading and goods receipt posting

10 min

Listen to this lesson

0:00 / 8:54

A goods receipt in EWM is two things at once. Physically, pallets come off a truck into a staging area. In the books, inventory management records a material document and finance a journal entry for the stock. Testers need to know which EWM step triggers the posting and where the stock sits afterwards, because "goods receipt done" means different things to the dock clerk, the buyer and Dan, the finance process owner.

  1. 07:40Truck at door DR02Inbound delivery 180000412 found by PO number or delivery number at the dock
  2. 07:55UnloadingTen pallets of 120 kits moved to staging bin in 9010; handling units scanned
  3. 08:00Goods receipt postedMaterial document for 1,200 pc into storage location 171R; journal entry: inventory at standard, GR/IR at PO price, price difference
  4. 08:05Putaway tasksTasks created to bulk floor 0030
  5. 09:30Putaway confirmedLast task confirmed; EWM posts 171R → 171A; stock available for sale
A morning receipt at Detroit, from door to available stock.
The Sign-Off Table · thesignofftable.com/academy/sap-ewm-202

Explicit or implicit goods receipt

SAP distinguishes two patterns. In an explicit posting, someone posts goods receipt first: in inbound delivery processing (/SCWM/PRDI, Maintain Inbound Delivery, with Goods Receipt and Save), in the physical goods receipt function at the door, from the warehouse management monitor, or for a whole transportation unit in yard processing. Explicit posting does not automatically create putaway tasks; they are created afterwards so strategies can be controlled. In an implicit posting, confirming the first warehouse task posts goods receipt, for example confirming the unloading task in a multi-step flow.

Explicit (receipt first)Implicit (task first)
TriggerUser posts goods receipt on the delivery or at the doorConfirmation of the first warehouse task, such as unloading
Putaway tasksCreated afterwards, manually or by follow-up actionAlready exist when receipt posts
When stock appears in the booksImmediately after postingWhen the first task is confirmed
Good forReceipts checked at the dock before any movementFast flows where scanning the first move is the check
The two goods receipt patterns. Contoso uses explicit receipt at the dock.
The Sign-Off Table · thesignofftable.com/academy/sap-ewm-202

Timing between EWM and inventory management

With storage locations for received-on-dock and available-for-sale, one receipt creates more than one material document: the receipt into 171R, then a posting change into 171A when putaway completes. If every task were confirmed one by one on a mobile device, many small material documents would follow. The inbound delivery's process profile carries a goods receipt mode that can hold the message to inventory management until goods receipt or putaway is complete. That reduces documents but creates a temporary difference between EWM and inventory management stock. Know which mode your project chose, because it changes what a tester sees in the stock overview halfway through a receipt.

With a delayed goods receipt mode, EWM stock moves before inventory management hears about it, so the test must expect a gap in between.
The Sign-Off Table · thesignofftable.com/academy/sap-ewm-202

What the receipt posts

ResultWhere to see itContoso example
Material document, movement type 101Material documents overview or PO history1,200 pc CMC-RGL-050 into plant 1710, storage location 171R
Journal entryFrom the material document to the accounting documentInventory debit $21,600 (1,200 × $18 standard price); GR/IR clearing credit $22,800 (1,200 × $19 PO price); price difference debit $1,200
PO historyPurchase order itemReceived quantity 1,200 of 1,200
EWM stockWarehouse monitor, stock and binTen handling units in the staging bin of 9010
Delivery statusInbound delivery in EWMGoods receipt complete; putaway not yet started
Posting change after putawayMaterial documents overview1,200 pc from 171R to 171A

Results of one receipt in embedded EWM.

Note the second material document. Many test cases stop at the first and declare success, while the business only cares about the second: regulator kits cannot be confirmed to aftermarket orders, and alternators cannot be confirmed to sales, until stock reaches 171A. Dan cares about neither: the value was booked at receipt, and the posting change between storage locations of the same plant does not change the inventory value.

One receipt creates two material documents: the first books the value, the second makes the stock usable for production and sales.
The Sign-Off Table · thesignofftable.com/academy/sap-ewm-202

What would you do?

Priya's team posts goods receipt for inbound delivery 180000412 and checks the stock overview: 1,200 kits in 171R. The test case expects 1,200 in 171A, and the tester wants to log a defect. What should Priya advise?

Key points
  • Explicit receipt posts first and creates tasks afterwards; implicit receipt posts when the first task is confirmed.
  • A receipt posts into the ROD storage location (171R); a posting change to AFS (171A) follows putaway.
  • The goods receipt mode in the process profile can delay the message to inventory management; test the intermediate state.
  • Evidence: material documents, journal entry, PO history, EWM stock and delivery status.

Check your understanding · not graded

Lesson check

  1. 1. In an implicit goods receipt, what triggers the posting?

  2. 2. After receipt and full putaway at Contoso, how many stock-related material documents exist?

  3. 3. Why can EWM and inventory management show different stock halfway through a receipt?

  4. 4. Does explicit goods receipt create putaway tasks automatically?