Lesson 1 of 5

Coverage

10 min

Listen to this lesson

0:00 / 9:52

Controlling is mostly downstream. Very little of what a controller reports is entered by a controller: costs arrive from purchasing, production, sales, payroll and asset accounting, and controlling's job is to put them on the right objects and turn them into product costs, variances and margins. That makes controlling test coverage different from most functional areas. You cannot test it on its own. Each controlling scenario has to be linked to the logistics or finance process that feeds it, and the test has to follow the value from the source document to the controlling report.

Four families of scenarios

Overhead managementCost center postings, allocations, activity allocation, internal orders, plan versus actual
Product costingStandard cost estimates and costing runs, material ledger, price differences
Period-endOverhead on orders, WIP, variances, settlement, controlling period lock
Margin analysisRevenue, sales deductions and COGS by market segment, reconciled with the P&L
The four scenario families a controlling test plan covers.
The Sign-Off Table · thesignofftable.com/academy/sap-co-304

For Contoso's system conversion the controlling scope is roughly forty scenarios across those families. The number matters less than the link to source processes. Priya's team builds a coverage matrix with controlling scenarios as rows and feeding processes as columns. A cell is marked when the end-to-end test for that process checks a controlling result, not only that the logistics document posted.

Each coverage matrix cell links a controlling scenario to the process that feeds it, a named tester and an end-to-end test that checks a controlling result.
The Sign-Off Table · thesignofftable.com/academy/sap-co-304
Controlling scenarioFeeding processControlling result to check
Cost center expensePurchase-to-pay (non-stock PO, invoice)Expense on cost center from the PO account assignment
Activity allocation to ordersProduction confirmationDetroit Assembly credited, order debited hours × $52
Standard cost of CMC-ALT-100Costing run before the periodReleased standard $150 in 1710, $156 in 1720
Production varianceMake-to-stock production with extra scrapVariance by category on the order, settled to finance
Margin by customerOrder-to-cash for Great Lakes Fleet ServicesRevenue and COGS on the right market segment and profit center
Intercompany margin1710 sells to 1810 ToledoInternal revenue and COGS in both company codes

An extract of Contoso's controlling coverage matrix.

Where the scenarios come from

Start from SAP Best Practices content in SAP Signavio Process Navigator, where scope items describe standard processes and their test scripts, and from Contoso's own process design, which for a system conversion means the ECC processes that stay. Then add the controlling-specific cases standard scripts tend to skip: period-end steps, negative tests, reconciliations, and anything that differs because of the conversion, such as cost elements now being G/L accounts or margin analysis running next to costing-based CO-PA. SAP Activate expects formal, documented tests for end-to-end processes and user acceptance, so record each scenario as a test case in SAP Cloud ALM with its expected controlling result.

Light touchRarely used internal order types; smoke test only
Regression checkStable, high-value postings such as cost center expenses: one test per process
Watch listChanged but low impact: custom reports, rarely used allocation cycles
Deep testingProduct costing, settlement, margin analysis, intercompany: many cases and reconciliations
Risk-based depth: where to spend the controlling test budget.
The Sign-Off Table · thesignofftable.com/academy/sap-co-304

Test levels for controlling

Controlling cases appear at every test level, but they prove different things. In unit and string tests the configuration team checks single settings: a costing sheet, an allocation cycle, a derivation rule. In integration tests the end-to-end processes run with controlling checks added, and period-end runs for the first time on realistic volumes. In user acceptance controllers and key users run their own month: they post, close, report and reconcile, and they judge whether the numbers make sense to the business. For a system conversion there is one more angle: the comparison of results before and after the conversion on the same data, which the next course in this track covers in detail.

LevelWho runs itControlling question it answers
Unit / stringConfiguration consultantsDoes each setting do what the design says?
Integration (SIT)Process teams with Priya's test teamDo values flow from source documents to the right controlling objects?
UATDan's controllers and the key usersCan the business run, close and report a month and trust the numbers?
Dress rehearsalCutover team with controllersDoes the close run in order and on time on production-like data?

Controlling across test levels at Contoso.

Write entry and exit criteria for controlling at each level. A sensible entry criterion for UAT is that every derivation defect from SIT is fixed and retested, because UAT testers who meet wrong profit centers stop trusting every other result. A sensible exit criterion is two consecutive test periods where margin analysis reconciles with the trial balance and allocations balance, with no open high-severity controlling defect.

Controlling entry and exit criteria act as gates between test levels.
The Sign-Off Table · thesignofftable.com/academy/sap-co-304

What would you do?

Midway through SIT, the order-to-cash team reports all its tests passed. Dan notices none of the test cases check the market segment or profit center on the billing document. What should Priya do?

Key points
  • Controlling is downstream: every scenario links to the logistics or finance process that feeds it.
  • Cover four families: overhead management, product costing, period-end and margin analysis.
  • A coverage matrix marks where an end-to-end test checks a controlling result, not just a posting.
  • Spend depth by risk: product costing, settlement, margin analysis and intercompany get the most.

Check your understanding · not graded

Lesson check

  1. 1. Why must controlling tests be linked to feeding processes?

  2. 2. What marks a cell in Contoso's coverage matrix?

  3. 3. Which scenario deserves the deepest testing after a conversion?

  4. 4. What is a sensible controlling entry criterion for UAT?