Allocation cycles move costs between cost centers. Overhead calculation does something different: it applies a surcharge to cost objects such as production orders, internal orders and WIP-carrying objects, based on costs already on them, and credits a cost center or order at the same time. It is how indirect costs that are hard to trace, such as material handling or production supervision, reach the products that cause them.

The costing sheet

The rules live in an overhead costing sheet. It combines three things. The base is the set of cost elements the surcharge applies to, for example raw material accounts. The overhead rate is either a percentage of the base or a quantity-based amount per unit, and it can depend on criteria such as plant, company code, order type or profit center, with separate rates for actual, plan and commitment data. The credit names which object is credited (a cost center or order) and under which cost element. The overhead itself posts on a secondary account with cost element category 41.

BaseRaw material accounts on the order (example: $40,000 of rotors and parts)
Overhead rateMaterial overhead 10% for plant 1710, actual; separate plan rate
CreditCredit cost center 17101106 Detroit Warehouse, overhead account category 41
ResultOrder debited $4,000 material overhead; Detroit Warehouse credited $4,000
Contoso's costing sheet CMC001, material overhead row, applied to one production order.
The Sign-Off Table · thesignofftable.com/academy/sap-co-303

Take a production order in plant 1710 for 500 units of CMC-ALT-100. By month end it carries $40,000 of material issues (rotors and other components), activity allocations from Assembly and Machining, and nothing else. The costing sheet CMC001 applies 10% material overhead on the material base. The overhead run debits the order with $4,000 and credits Detroit Warehouse with $4,000. Detroit Warehouse's costs are now partly absorbed by the products that used its services; the remainder shows up as under- or over-absorption on the cost center, which the controller analyzes.

The same costing sheet can serve planning. When Contoso runs its standard cost estimate for CMC-ALT-100, the costing sheet applies the plan rate to the planned material costs, so the standard price already contains material overhead. At period end the actual rate applies to the actual base on each order. If the two rates or bases differ, the difference becomes part of the order's variance at settlement. That link is worth stating in test scripts: a change to an overhead rate changes both the next standard cost estimate and the variances of open orders, so it must be tested in both places. Quantity-based overhead works the same way, except that the base is a quantity such as machine hours confirmed on the order, multiplied by an amount per unit.

Costing sheet CMC001 applies the plan rate in the standard and the actual rate on the order; any gap becomes part of the order variance.
The Sign-Off Table · thesignofftable.com/academy/sap-co-303

Running overhead

Overhead is a period-end function, run individually or collectively for a range of orders. Classic transactions remain in use in many private cloud systems, for example individual and collective overhead for production orders and for internal orders; SAP Fiori job templates are available for scheduling period-end overhead runs, and SAP's training notes that overhead is now calculated per ledger, with the ledger optional when only one ledger exists. Every run offers a test run (simulation) that produces the result and an error log without posting. Use it.

  1. Order costs completeMaterial issues, confirmations and activity allocations posted for the period
  2. SimulateOverhead test run for all Detroit production orders; review log and amounts
  3. PostUpdate run debits orders and credits the costing sheet's credit objects
  4. Analyze absorptionCompare credits on Detroit Warehouse with its actual costs
Overhead calculation in four steps.
The Sign-Off Table · thesignofftable.com/academy/sap-co-303
CheckWhat it tells you
Order shows overhead on the category 41 accountThe costing sheet was found and applied
Amount = base × rateThe base cost elements and rate are correct for this plant and order type
Credit object received the same amountThe credit key points to the right cost center or order
Orders without overheadMissing costing sheet on the order or no base costs: a gap to explain

Four checks on an overhead run.

Leave on the cost centerSmall and hard to trace: report as period cost
Activity allocationSmall but measurable: charge hours or units
Overhead surchargeLarge and hard to trace: apply a rate on a sensible base
Activity allocation or process costingLarge and measurable: charge by driver for accuracy
Choosing between overhead surcharges and activity allocation for an indirect cost.
The Sign-Off Table · thesignofftable.com/academy/sap-co-303

What would you do?

After the May overhead run, three Detroit production orders show no material overhead while others do. Priya asks what to check first.

Key points
  • Overhead calculation applies a surcharge to cost objects based on costs already on them, and credits a cost center or order.
  • The costing sheet holds the base, the rate (percentage or quantity-based, with dependencies) and the credit.
  • Overhead posts on a category 41 account; amount = base × rate.
  • Run overhead after the logistics cut-off and before WIP, variances and settlement, with a test run first.

Check your understanding · not graded

Lesson check

  1. 1. An order has $40,000 on the material base and a 10% material overhead rate. What overhead is posted?

  2. 2. Which part of the costing sheet decides which cost center is credited?

  3. 3. Material issues post to an order after the overhead run. What happens this period?

  4. 4. Chicago's material overhead rate is 11% against Detroit's 10%. Where is that difference maintained?