Now accepting guest editorial from SAP, Oracle, Workday and ServiceNow practitioners.Pitch a guide
The Sign-Off Table

Lesson 1 of 5

Ingredients of a cost estimate

11 min

Listen to this lesson

0:00 / 6:18

A standard cost is the price at which a manufactured product is valued in inventory, issued to production and sold. At Contoso Motor Co., one alternator CMC-ALT-100 carries a standard cost of USD 150 in Detroit (plant 1710) and USD 156 in Chicago (plant 1720). Those numbers are not typed in by someone in finance. They are calculated by a standard cost estimate from the way the product is built and what each input costs.

To trust the result, you need to know the ingredients. When an estimate looks wrong, the cause is almost always one ingredient, not the costing engine.

Costing variantThe recipe: which prices, which dates, which quantity structure, what the result may update
Quantity structureBill of material (what goes in) and routing (how it is made)
Prices for materialsPurchased components valued by the valuation variant strategy, for example planned price or moving average
Prices for activitiesPlanned activity prices of the work centers' cost centers, such as labor and machine hours
OverheadCosting sheet surcharges on material and conversion costs
The ingredients of a standard cost estimate, from control to detail.
The Sign-Off Table · thesignofftable.com/academy/sap-co-204

Quantity structure: BOM and routing

The bill of material lists the components and quantities for one costing lot. For CMC-ALT-100 it includes the rotor CMC-RTR-200, bought from Lakeside Components, plus a stator, a housing, a regulator and small parts. The routing lists the operations, the work centers that perform them and the standard values, such as setup time and machine and labor time per unit. Each work center points to a cost center and the activity types it provides. A production version tells costing which BOM and routing to use for the lot size and date.

The quantity structure links the material to its BOM and routing, and each routing operation reaches an activity price through its work center's cost center.
The Sign-Off Table · thesignofftable.com/academy/sap-co-204

Prices: materials and activities

Purchased components are valued according to the valuation variant of the costing variant. SAP's learning material describes it as a list of price strategies searched in order; the first price found is used. A typical sequence for purchased parts is planned price 1, then the standard or moving average price, then the purchasing info record. Activities are valued with planned activity prices from cost center planning: for example USD 52 per labor hour at Detroit Assembly and USD 96 per machine hour at Detroit Machining.

  1. Strategy 1Planned price 1 in the material master
  2. Strategy 2Standard price or moving average price
  3. Strategy 3Net price from the purchasing info record
  4. ResultThe first price found values the component in the estimate
A typical valuation strategy sequence for purchased components (example; your valuation variant may differ).
The Sign-Off Table · thesignofftable.com/academy/sap-co-204

Overhead

Some costs cannot be traced to a unit, such as warehouse handling or plant supervision. A costing sheet applies them as surcharges: for example 10% material overhead on material cost and 24% production overhead on labor and machine cost. The same costing sheet later applies actual overhead to production orders, so the standard and the actuals are built on the same logic.

How the USD 150.00 Detroit standard for CMC-ALT-100 is built from material, two activities and two overhead surcharges.
The Sign-Off Table · thesignofftable.com/academy/sap-co-204

The costing variant

Each estimate is based on a costing variant. SAP's course describes it as the main control element: it combines a costing type, which says which price field the result may update (for a standard cost estimate, the standard price) and a valuation variant, which says where prices come from. It also holds date control, quantity structure determination and transfer control. Most companies use one costing variant for standard costs and protect it from casual change.

SettingWhat it controlsWhy a tester cares
Costing typeWhich material price the result can updateOnly a standard costing type may change the standard price
Valuation variantPrice strategies for materials, activities, subcontracting, overheadWrong strategy order means wrong component prices
Date controlCosting, quantity structure and valuation datesDecides which BOM, routing and prices are valid
Quantity structure determinationHow BOM and routing alternatives are selectedWrong selection costs the wrong production method
Main settings inside a costing variant.
The Sign-Off Table · thesignofftable.com/academy/sap-co-204

What would you do?

Kenji's team asks why the new standard for CMC-ALT-100 in Chicago is USD 156 when Detroit's is USD 150, given the same BOM. What is the most likely explanation?

Key points
  • A standard cost estimate combines quantity structure (BOM, routing) with prices and overhead.
  • Purchased components are priced by the valuation variant's strategy sequence; activities by planned activity prices.
  • A costing sheet applies overhead as surcharges.
  • The costing variant (costing type plus valuation variant plus dates) controls the whole estimate.

Check your understanding · not graded

Lesson check

  1. 1. Where does the labor cost in a standard cost estimate come from?

  2. 2. What does the valuation variant decide?

  3. 3. How does a costing sheet add overhead?

  4. 4. Which part of the costing variant says the result may update the standard price?