Now accepting guest editorial from SAP, Oracle, Workday and ServiceNow practitioners.Pitch a guide
The Sign-Off Table

Lesson 4 of 5

The controlling area

9 min

Listen to this lesson

0:00 / 6:15

Every cost center, internal order and activity type belongs to a controlling area. SAP's material defines it as the organizational unit within a company for which a complete, self-contained cost accounting can be performed. One consequence is easy to remember and important in testing: costs cannot be allocated outside a controlling area. If two company codes are in different controlling areas, an IT cost center in one cannot charge the other through a normal allocation.

Operating concernHighest reporting level for profitability analysis; one or more controlling areas are assigned to it
Controlling area A000Contoso's cost accounting frame: cost centers, orders, activity types, allocations
Company codes1710 Contoso Motor Co. and 1810 Contoso Parts Distribution LLC, both USD; Wave 2 adds 1910 Alternadores del Norte (MXN)
Plants and cost centersPlants 1710 Detroit, 1720 Chicago, 1810 Toledo, later 1910 Monterrey; cost centers in each company code
Where the controlling area sits in Contoso's organizational structure.
The Sign-Off Table · thesignofftable.com/academy/sap-co-101

Assigning company codes

A controlling area can contain one company code (a 1:1 assignment) or several (cross-company-code cost accounting). With several company codes in one controlling area, allocations and reports can run across them, which is what Contoso wants: the IT department in 1710 also serves Contoso Parts Distribution in 1810. SAP's material sets a firm prerequisite: all company codes assigned to one controlling area must use the same operational chart of accounts. The system checks further prerequisites, such as compatible fiscal year settings, during assignment; confirm them with your controlling expert for your release.

One controlling area can hold several company codes, which must share an operational chart of accounts; every cost center belongs to one company code inside it.
The Sign-Off Table · thesignofftable.com/academy/sap-co-101
  1. Do the company codes share services or need allocations between them?Yes → consider one controlling area for both · No → continue
  2. Do they use the same operational chart of accounts?No → separate controlling areas, or harmonize the chart first · Yes → continue
  3. Do managers need cross-company cost reports in one currency?Yes → one controlling area with a common controlling area currency · No → either design works
One controlling area or several?
The Sign-Off Table · thesignofftable.com/academy/sap-co-101

Currencies

Management accounting works with three currencies. The controlling area currency is the currency the controlling area is managed in; Contoso's is USD. The object currency is the currency of an individual cost center or order; SAP's material notes that in a cross-company-code setup, the object currency defaults to the company code currency unless all company codes share the same currency. The transaction currency is the currency of the original document, such as a Lakeside Components invoice in USD or a Mexican supplier invoice in MXN.

CurrencyContoso today (1710, 1810)After Wave 2 (with 1910, if assigned to A000)
Controlling area currencyUSDUSD: cross-company reports in one currency
Object currencyUSD for all cost centersMXN for Monterrey cost centers, USD for US ones
Transaction currencyMostly USDMXN and USD documents

Currency effects of adding a foreign company code to a controlling area.

This is why the Wave 2 design discussion matters for testing. If 1910 joins A000, Monterrey cost centers are managed in MXN as their object currency while reports across Contoso can be read in USD, and every cross-currency report gains an exchange rate question that testers must check. If 1910 gets its own controlling area, reports stay simple but costs cannot be allocated between Detroit and Monterrey. Contoso's controlling team chose to assign 1910 to A000; the test plan for Wave 2 includes currency checks for every cost center report.

What would you do?

The Wave 2 team proposes giving Alternadores del Norte (1910) its own controlling area "to keep things simple", while the CFO wants Detroit's engineering costs charged to Monterrey through allocations. What should Dan point out?

Key points
  • A controlling area is the frame for a self-contained cost accounting; costs are not allocated outside it.
  • One or several company codes can be assigned; all must share the operational chart of accounts.
  • Currencies: controlling area currency, object currency, transaction currency.
  • Cross-company setups let reports and allocations span company codes in one currency.
  • Controlling area design is foundational; review it early, and test currency effects.

Check your understanding · not graded

Lesson check

  1. 1. What must all company codes in one controlling area share, per SAP's material?

  2. 2. Can costs be allocated from a cost center in one controlling area to another?

  3. 3. Which currency is a Monterrey cost center managed in if 1910 joins A000?

  4. 4. Which level sits above the controlling area for profitability analysis?