Lesson 5 of 5

Revisiting decisions

10 min

Listen to this lesson

0:00 / 7:48

Good decisions can become wrong without anyone making a mistake. An acquisition adds a country, SAP changes a roadmap, a vendor contract renews, an incident reveals a weakness, a regulation changes. Architecture governance must make it normal to revisit decisions when facts change, and abnormal to revisit them because someone simply prefers another option.

Triggers for revisiting

TriggerContoso exampleTypical question
Business changeAcquisition of Alternadores del Norte (Wave 2)Do integration and data decisions still fit a second country and currency?
SAP roadmap or terms changeUpdated transition or maintenance terms; new clean core guidanceDoes any decision depend on the changed date or capability?
Assumption review dateADR-007 review after Wave 2 cutoverIs the rebuild capacity still there?
Incident or quality signalRepeated interface failures in hypercareIs the pattern or the implementation at fault?
Cost or contract eventSubscription renewal for a BTP serviceIs the service still the best option at the new price?
RegulationElectronic invoicing rules for the Mexican entityDo output and integration decisions meet the new obligation?

Common triggers for revisiting architecture decisions.

A disciplined revisit

  1. Trigger loggedWho raised it, which decisions it may affect
  2. Impact scanFind ADRs whose assumptions or context the trigger touches
  3. ReassessFor each affected ADR: do the original criteria and scores still hold?
  4. DecideConfirm the decision (and record the check) or open a new decision
  5. SupersedeNew ADR links to the old one; test consequences and migration plan included
Revisiting a decision without losing its history.
The Sign-Off Table · thesignofftable.com/academy/sap-arc-401

Revisiting does not mean reopening everything. Most triggers touch a few records. The impact scan is quick when records list their assumptions and links. For each affected decision, ask whether the original criteria and their scores still hold with the new facts. Often the answer is yes, and the useful output is a dated note on the record: "checked after Wave 2 cutover; still valid".

Avoiding two classic errors

ErrorWhat it looks likeGuard
Sunk-cost persistenceKeeping a failing approach because of what it already costCompare options on future cost and risk only
Decision churnReopening decisions whenever a new person or vendor prefers something elseRequire a new fact or a failed assumption to reopen
Silent driftTeams quietly work around a decision without changing itArchitecture reviews of designs and code against accepted ADRs
Errors in revisiting decisions and how governance guards against them.
The Sign-Off Table · thesignofftable.com/academy/sap-arc-401

A review rhythm

Triggers catch the obvious changes; a rhythm catches the quiet ones. Many architecture boards review, once a quarter, every record whose review date has passed and every assumption tied to an external date, such as a maintenance deadline or a contract renewal. The review is short when records are well kept: confirm, note the date, or open a new decision. It also produces a useful governance signal for the PMO, the number of overdue reviews, which tells Grace whether architecture governance is keeping pace with the program.

A quarterly review catches the quiet changes and gives the PMO a simple signal: how many reviews are overdue.
The Sign-Off Table · thesignofftable.com/academy/sap-arc-401

Revisiting has a test cost too

Changing a decision late is a change like any other, and often a large one. Moving an extension from classic ABAP to ABAP Cloud, or an interface from synchronous to asynchronous, needs its own testing: the new implementation, the migration of data or configuration, and regression of everything around it. The new decision record should state those consequences, and the release plan should give them capacity. Where the original decision used a toggle or a contract, the change is much cheaper to test, which is one more reason to design those in.

The Alternadores acquisition left the integration strategy standing but produced two new records, each with its own test consequences.
The Sign-Off Table · thesignofftable.com/academy/sap-arc-401

What would you do?

Eighteen months after go-live, a new IT director wants to replace the integration platform decision because a different approach was standard at their previous employer. Nothing has failed and no assumption has changed. What should the architecture board do?

Key points
  • Revisit on triggers: business change, roadmap or terms change, review dates, incidents, cost and regulation.
  • Scan impact through ADR assumptions and links; confirm or supersede.
  • Guard against sunk-cost persistence, churn and silent drift.
  • A changed decision is a change with its own test scope; plan capacity for it.

Check your understanding · not graded

Lesson check

  1. 1. Which is a valid trigger for revisiting an architecture decision?

  2. 2. What is sunk-cost persistence?

  3. 3. What is often the useful output when a revisit finds the decision still valid?

  4. 4. Why are decisions designed with toggles or contracts cheaper to change later?