The complete guide · Functional changes & simplification items
SAP Simplification List & SI Check: S/4HANA Guide
Find the SAP simplification list for your S/4HANA target, run the SI-Check, and turn each relevant item into a tested, signed-off task.


If you are moving an ECC system to S/4HANA, the simplification list decides how much of your project is technical housekeeping and how much is changed business process. Each entry is a simplification item: a documented SAP change that may touch your data, your custom code or the way a process runs. The tool that tells you which items apply to your system is the Simplification Item Check (SI-Check), started from the report /SDF/RC_START_CHECK in transaction SA38.
The list itself now lives in the online Simplification Item Catalog. The PDF still exists, but SAP treats it as a snapshot. This guide shows where to get the catalog for your target release, how to run the check, how to read red, yellow and green results, and how to turn relevant items into owned, tested work before cutover. Part 1 covers the list, the catalog, the tools and the check run. Part 2 covers custom code reconciliation, testing, upgrades after go-live and the mistakes that cost teams the most.
A green line in the check report is not evidence that a business process works. It is evidence that the system passed one set of technical consistency rules. Sign-off needs the business process test that proves the change behaves the way the business expects.
- The Simplification Item Catalog is the current source for simplification items. Use the PDF only as a snapshot of a past release.
- Readiness Check is your planning tool. The SI-Check is the mandatory consistency gate, and SUM calls it again before downtime.
- Run the check with the notes and TCI prerequisites in place, against the target release you actually plan to reach.
- Every relevant item needs an owner, a fix or exemption decision with business sign-off, and a test case with evidence.
- A green or exempted item still needs a process test. Sign-off means the business process works after conversion.
1. What the simplification list is, and why the catalog replaced the PDF
A simplification item is SAP's written account of one change between the ERP source and the S/4HANA target. Each item details the steps that need to be taken for the conversion and/or the upgrade from a business and a technical point of view, both preparatory and follow-on steps, and each item is available as a SAP Note. That structure matters for testing. The preparatory steps tell you what to fix before conversion. The follow-on steps tell you what to verify afterwards.
The "Simplification List for SAP S/4HANA" was the document that collected those items. SAP still publishes it as PDF, but SAP's own guides now describe it as a document version of the Simplification Item Catalog. For up-to-date content, SAP points you to the catalog itself, which lets you search and browse the full SAP S/4HANA Simplification List. The PDF also runs to a very large document; one SAP community post describes it as over 1000 pages, which is why most teams search the catalog instead of reading the whole file.
The catalog is the single source of truth. SAP describes it as the place where simplification items are maintained, and the Simplification Item Check and Readiness Check both read from it. The Simplification Item Catalog is the single source of truth for simplification items. The Simplification Item Check performs the relevancy and consistency checks based on the content in the Simplification Item Catalog. A static PDF can drift from the checks that run against your system. The catalog and the check content are updated for each target release.
Two cautions. First, the catalog is not a to-do list for your system. The catalog contains all the simplification items, not only those that are relevant for your conversion project. Second, the PDF is not dead. SAP still publishes a 2025 version for Feature Pack Stack 1 and SAP S/4HANA Cloud. If someone on your team is working from a PDF, confirm which feature pack it covers before anyone uses it for scoping.
2. Where to find the Simplification Item Catalog for S/4HANA 2023 and 2025
SAP's conversion and upgrade guides point to the same web entry point: the Simplification Item Catalog on the SAP Support Launchpad. Access requires an S-user. Some SAP community posts also show the same content opened from SAP for Me, so if your team uses that route, check that you are looking at the same release list. The current 2025 guides are at Document Version 3.0 in the Conversion Guide for SAP S/4HANA 2025, and the 2025 upgrade guide for Private Edition is at Document Version 3.0 on the SAP Help Portal.
Filtering works by target release first. The catalog is a tool that allows you to search or browse the complete collection of simplification items grouped by product version and presented by application or functional area. Pick the target release you plan to reach, not the one you hope to reach later. Then use the application or functional area filter to narrow the list to finance, logistics, sales or master data. Download the results as a ZIP. A community post by SAP describes the same flow: you can download the content into a zip file in the list view, and the SI-Check later uploads that file.
When a search returns nothing, the usual cause is the target release, not the item. The catalog holds a list of generally available target product versions and documented simplification items. If you have a local copy in your source system, that copy may predate the release you searched for. SAP's guidance says the target version list in a local replica will now include the latest generally available SAP S/4HANA product versions after you update it. Also check whether your search term is the item title or the item ID; the ID format looks like SI2 with a short name after it.
If the result is still missing for a release that is generally available, open a support case rather than assuming the item does not apply. SAP KBA 3752134 covers "object does not exist" errors in the SI-Check for a 1809-to-2025 path, which is the kind of error that can look like a missing item when it is really a content or version problem. Read that note before you start chasing those messages.

3. Anatomy of a simplification item
Every item has an ID, a title, a business impact note and one or more technical notes. The ID is what you will see in the check report. A typical example from SAP's own catalog content is an item with the ID SI2 and the title MasterData_BP. In the check report, SI2 is relevant only when there is data in the legacy vendor master table LFA1, which is why a system with no vendor data can show it as irrelevant. For example, the same item SI2: MasterData_BP which has been shown in Simplification Item Catalog above, it is relevant for the below ERP system because there is data in LFA1.
The business impact note explains the change in business terms. One well-known example is the item for Business User Management. SAP's list states that Business User Management in SAP S/4HANA is mandatory and is automatically activated during the conversion from SAP Business Suite to SAP S/4HANA. That is not a feature you switch on later. It changes how users and business partners link during conversion, so the test owner needs to know it exists.
Release applicability is part of the item definition, not a separate list. The relevance logic uses the calculation based on source release, target release and relevance check section. The same item can be relevant for a 2020 source and irrelevant for a 2023 source, so re-run relevance when you change either release.
Items also carry technical checks. Some items have a consistency check, and others do not. Some simplification items have a consistency check. Where a check exists, SAP delivers it as an ABAP class through the check content. For example, the consistency check for one master data item is implemented by a class named CLS4SIC_LO_MD_BP, which is delivered via SAP Note 2502552. You do not need to read the class code. You do need to know that the check result comes from that class and that a failing class means the item is not finished.
Custom code is linked to the same concept. The custom code migration checks are based on the simplification item concept. A custom program can therefore appear under a simplification item even if no standard SAP table in that item is changed by you. This is why the custom code scan and the item list need reconciling, which Part 2 covers.
4. Readiness Check vs. Simplification Item Check: who does what
The two tools overlap, and teams often treat them as the same thing. SAP's guides say they are not. While both the SAP Readiness Check and the Simplification Item-Check can display information on simplification item relevance and consistency, they serve different purposes and are both required. The Readiness Check is for planning, and the SI-Check is for the gate before conversion.
SAP describes the Readiness Check as mainly a planning tool which you run early in the project. Use it to size the work, build the work packages and track how many items remain open. The SI-Check is different. It is called by the Software Update Manager (SUM) tool and it identifies the simplification items relevant for your system upgrade. SAP's guide also states that if dedicated simplification items require further mandatory preparation steps, the technical upgrade procedure stops to help ensure a consistent system upgrade.
The SI-Check cannot be skipped. An older SAP-related blog notes that when SUM calls the check, this check execution is mandatory and cannot be skipped. Treat that as the reason the SI-Check belongs in your go/no-go evidence, not only in the Basis runbook.
Here is how SAP's 2025 upgrade guide compares the two tools.
| Aspect | SAP Readiness Check | Simplification Item Check (/SDF/RC_START_CHECK) |
|---|---|---|
| Type and delivery | Customer self-service provided by SAP, with Digital Business Services as standard support | Standalone report in the system |
| Where you use it | Cloud-based web interface | SAP GUI, transaction SA38 |
| Checks included | Simplification item relevance, custom code, recommended Fiori apps, add-on compatibility, SAP custom development projects | Simplification item relevance and consistency before conversion or upgrade |
| Role in the project | Early planning, scope and work packages | Cleanup during the project, then the final check run by SUM |
| Prerequisite | Data collection from the source system | Notes 2399707 and 2502552, plus the Maintenance Planner stack file |
Source: Upgrade Guide for SAP S/4HANA 2025, Tool Comparison. Prerequisites row summarized from the same guide and the SI-Check notes covered in Section 5.
The table above matches the way SAP describes the tools, but the practical difference is about timing. The Readiness Check can run months before conversion, while the SI-Check has to run in the system you are converting, before SUM starts. While the SAP Readiness Check can already be run months before a system conversion, to begin planning the project and define the corresponding work packages, you must run the SAP Simplification Item Check during the system conversion, and indeed prior to the SUM process.
Use this decision path to choose the right run.
- Are you still scoping, sizing or building work packages?Yes → run the SAP Readiness Check now and keep it for burndown · No → go to the next question
- Are you in the build or freeze period for the DEV conversion?Yes → run /SDF/RC_START_CHECK in the source system and fix or exempt every relevant item · No → keep the catalog current and re-run after any change to release or data
- Did you change a relevant item's data, code or configuration?Yes → re-run that single item with Check Consistency Details · No → keep working toward the final SUM run
5. How to run /SDF/RC_START_CHECK step by step
The steps below follow SAP's guides and the SAP community posts that implement them. Before you start, confirm the current version of each note on the SAP Support Portal, because the minimum version depends on the release you are targeting. The two notes are SAP Note 2399707, Simplification Item Check, which provides the check framework and report, and SAP Note 2502552, S4TC - SAP S/4HANA Conversion & Upgrade new Simplification Item Checks, which provides the check classes.
Step 1: Implement the prerequisite notes in the source system
Implement 2399707 and 2502552 in the backend system only. SAP's guidance is that the check is exclusively intended to be implemented and run on your SAP ERP / SAP S/4HANA backend system. The front-end hub is not the place. Note 2502552 is not optional. You cannot run Simplification Item Check without Note 2502552. Also check the minimum versions for your target: each SAP S/4HANA release or feature package/support package has a specific minimum version of SAP notes 2399707 and 2502552 which need to be installed for the check and the conversion.
Step 2: Enable transport-based correction instructions (TCI)
The check classes arrive through TCI, so the system has to be able to take them. Log on to client 000, enable TCI, and follow the preparation steps in the conversion guide and SAP Note 2187425. The TCI enablement has to be done in every system in the landscape, not only in DEV, so plan it for QAS and PRD as well. Treat it as a Basis change with its own transport and a rollback plan.
Step 3: Run the Maintenance Planner first
The SI-Check needs the stack file. You need to run the Maintenance Planner before the Simplification Item-Check (SI-Check), because the SI-Check report also requires the stack.xml file as an input. If the stack is wrong, your relevance results will be wrong, so do not skip this step to save time.
Step 4: Load the catalog content
Start SA38, run /SDF/RC_START_CHECK, and choose the local catalog option. The report has a button to download the local catalog and an upload option for a catalog file. One SAP community post advises that to save the check content used for your DEV conversion, download it via the "Download Local Simplification Item Catalog" button in report /SDF/RC_START_CHECK. Keep the same file for every system in the project.
There is a conflict in the sources on the update button. An SAP post from several years ago told teams not to press "Update Catalog with latest version" while they had newer notes in the queue. A more recent SAP community post describes the same button as the way to refresh a stale local copy. The reconciling practice is to pin the catalog for the DEV freeze, then update on purpose and log the date and version you used.
Step 5: Choose the target release and the mode
In the options section, choose the target S/4HANA version. Then choose a run mode. The online mode shows results as soon as the check finishes. SAP recommends the background job if the check will need a long running time. A community answer describes the relevance-only online run as the first step, followed by a full run when you need consistency results.
Step 6: Run relevance, then consistency
When you start the report manually, only the relevance checks are run automatically in order to determine which Simplification Items are probably relevant and which are not. From the result screen, use the button to start the consistency checks for all relevant Simplification Items with the "Check Consistency for all" button. Expect this to take time on a large system.
Which client to use is a point to confirm. An SAP community answer says the relevance check runs on the productive client, while the consistency check is executed on client 000 only evaluates those simplification items marked as relevant or potentially relevant to the system. Confirm this against the current note text for your release before you publish a runbook, because community answers age faster than notes.
6. Reading the results: relevance, consistency, return codes and exemptions
The result has two parts: a relevance list and, for each relevant item, a consistency result. The relevance list shows a list of relevant and irrelevant simplification items. SAP's guidance is that you check every relevant simplification item for the impact it will have on your upgrade project. An irrelevant item does not need a test, but keep the list as evidence that you looked at it.
The traffic light colors have a simple meaning. YELLOW items are for Warning and GREEN items are for No inconsistency. Red means the system is inconsistent for that item, and the red items need to be fixed. Yellow is not a pass. A warning can still be a real change to a business process, and you need to read the item before you close it.
Open the detail log for any item that is not green. The log explains which object is inconsistent and the steps to correct it. The Display Consistency Check log button is used to show the errors in more detail. The business impact note and the SAP Note in the log tell you the fix. The log is the work instruction, so copy the relevant part into your item record.
Return codes decide what SUM does next. For the legacy exemption rules, one blog describes return code 7 errors as the ones you can exempt. A community answer says that when the return code in Consistency Check is higher than 7, SUM process will be affected and stopped. Read the return code in the log before you decide. Our separate guide on return codes 7, 8 and 12 goes through the patterns in more detail.
Exemptions are where most sign-off risk sits. The result list has an "Exemption Possible" column to see items which are exemptable or which have already been exempted. The exemption is a statement that the team has read the note and understands the implications. One SAP community post reads it as confirm that you have read the note and checked out the implications before setting exemption. In our view that statement needs a named business owner, not only a Basis signature. Also note that exemption is available from the first overview screen, and judge carefully first before applying the exemption.
After you fix an item, do not run the whole report again just to see one line change. Re-run the detail for the specific item. One SAP-related blog says that to see updated results re-run "Check Consistency Details" for the specific Simplification Item where you did fix the inconsistencies. Record the item ID, the date and the person who re-ran it.
Watch the compatibility pack items as well. In a recent SAP post, the check now reports compatibility pack usage, and the post notes this applies with the latest version of 2399707. We have modernized our different compatibility pack usage reports and combined them in the simplification item check. If your system uses compatibility packs, that is now a check result, not a separate report.
7. The items that hit most ECC customers
Some items come up in almost every ECC conversion. The table below shows the work they usually generate and our test-depth rating. The ratings are our practitioner judgement for planning, not SAP guidance, so adjust them to your own business processes. Each row points to the SAP Note or deep-dive page you should start with, not to a fixed fix list.
| Item area | Pre-conversion task | Post-conversion task | Custom code impact | Business process change | Test depth |
|---|---|---|---|---|---|
| Business Partner / CVI | Clean up customer and vendor duplicates, check number ranges, confirm the CVI mapping | Verify customer and vendor links to the business partner, and partner functions | Programs that read the customer or vendor master tables directly | Master data is maintained through the business partner | High |
| Material Ledger | Confirm whether actual costing is active, and review valuation and period settings | Run the first period-end close and check price changes and inventory values | Reports and interfaces that read costing tables | Costing and month-end sequence can change | High |
| Asset Accounting | Check asset master and depreciation area consistency | Run depreciation and reconcile the asset register to the general ledger | Custom asset reports and BAPI calls | Asset postings are reconciled through the universal journal | High |
| Credit Management | Confirm which credit method is in use and review the consistency results | Recalculate exposure and test release from credit blocks | Custom credit checks and exits | Credit release steps can change for sales staff | Medium to high |
| MATDOC | Find every program that reads the legacy material document tables | Compare stock and movement reports before and after conversion | Direct reads of legacy material document tables | Goods movement reporting changes for warehouse users | High |
| SD pricing | Review pricing procedures, condition tables and user exits | Regression test quotes, orders, invoices and pricing results | User exits, custom condition tables and pricing routines | Pricing results can change for specific customers or conditions | High |
| Output management | Inventory output types and forms in use | Test print, email and archive output for each output type | Custom SAPscript and Smart Forms | Documents sent to customers and suppliers may look different | Medium |
Test depth is our rating for planning. Item content: SAP Learning, Key Functional Topics in a System Conversion to SAP S/4HANA.
For the first row, read the SI2 example above and then the deep dive. Our step-by-step CVI guide covers the conversion sequence. For finance items, the Finance Conversion Essentials course and our note on reconciling finance data before and after migration cover the evidence you need. For output management, our guide to whether Smart Forms and SAPscript still work in S/4HANA is the place to start.
We do not yet have a standalone deep dive for Material Ledger, Asset Accounting, Credit Management, MATDOC or SD pricing. For those items, start with the item's business impact note and the consistency log, then use our Simplification Item Test Impact Tracker to record your scope. Part 2 shows how to turn these rows into a backlog and a test plan.
8. Turning relevant items into a project backlog
A relevance list is not a backlog. Each relevant item needs one named owner, one decision and one piece of evidence before it counts as done. This is the path from catalog to sign-off that the rest of this section assumes.
- Browse the catalogPick the target release you will actually reach and download that content
- Readiness CheckSize work packages and track open items during planning
- SI-Check in the sourceRelevance first, then consistency for each relevant item
- Fix or exemptEvery red or yellow item gets a fix or a business-approved exemption
- Re-run the single itemConfirm the fix on that item without rerunning the whole list
- SUM runs the check againThe final gate before downtime, where open mandatory steps stop the upgrade
- Follow-up, regression and sign-offPost-conversion tasks, process tests and signed evidence
Sort each relevant item into one of four buckets before anyone estimates it. The buckets drive the owner, the due date and the test depth.
- Mandatory pre-conversion task: cleanup or configuration in the source that has to be finished before the check and the conversion can pass.
- Post-conversion task: the follow-on steps the item calls for once the system runs on the target release.
- Custom code impact: a finding that lands in a report, form, enhancement or interface your team owns.
- Business process change: a change in how a user, a role or a posting works, even when no code moves.
The item documents both sides. Each simplification item details the steps that need to be taken for the conversion and/or the upgrade from a business and a technical point of view, both preparatory and follow-on steps and each item is available as a SAP Note. Use those steps to decide which bucket an item belongs in. Read the business impact text, not only the technical note.
Name one owner per item, not one owner per team. Basis usually owns TCI, the notes and the check runs. The functional lead owns the process change. A developer owns the custom code finding. The test lead owns the test case. A business owner approves any exemption and any closure of a process change. Set due dates against the project calendar: cleanup before the DEV freeze, follow-on tasks before the first mock conversion, and process test evidence before UAT sign-off.
9. Simplification items and custom code
The custom code scan and the simplification item check are two views of the same problem. The custom code migration checks are based on the simplification item concept. SUM runs both. Simplification Item-Check and custom-code migration checks are carried out by the SUM tool. A clean SI-Check does not tell you that your custom code is clean, and a clean custom code scan does not tell you that your business process is unaffected.
For the 2025 upgrade path, SAP's guide asks you to check custom code against the simplifications in an SAP S/4HANA 2025 system, on the feature package or support package stack you plan to reach, using the Custom Code Migration tool or the ABAP test cockpit. Before upgrading to SAP S/4HANA 2025 (or any of its feature package or support package stacks), you need to check your custom code against the SAP S/4HANA simplifications in an SAP S/4HANA 2025 system. A scan run on the wrong stack produces findings you cannot sign off.
Reconcile the two lists in one register. For each relevant item, record the item ID, the title, any ATC finding that points to the same change, the custom object name, the owner and the decision. Two gaps show up often. An ATC finding can point to an item the SI-Check marked as irrelevant for your data, so check why before you dismiss it. A relevant item can have no custom code finding at all, and it still needs a process test. Our SAP Custom Code (ATC) Remediation and Retest Tracker covers the code side, and the custom code migration guide covers the scan itself.
10. Testing simplification items: from item to test case
Every relevant item becomes a test item with the same fields. A green check in the report does not fill these fields for you. Record these for each item:
- Risk rating (High, Medium or Low), with one sentence on why. A posting change in finance and a print change for customers are not the same risk.
- Affected processes, pulled from the business process test scope matrix, so the item maps to the processes the business runs.
- Test scenarios: the normal path, the exception path (partial deliveries, blocked records, reversals) and, where the item changes existing data, a check of the converted records.
- Data variants: the population the item touches, including old records that the conversion has to carry forward. Test data choices are covered in the test data course.
- Evidence: test case ID, item ID, SAP Note number, system and client, run date, result, defect IDs and the approver.
Put the same item through two cycles. System integration testing proves the technical flow works across the integrated scope, including the fix the consistency check asked for. User acceptance testing proves a business user can run the process and accept the result. High-risk items belong in both cycles. Low-risk items can go into the regression pack, but write down the reason so the decision survives a handover.
Use the swimlane below to see who does what from the moment the notes are in place to the moment the item closes.
| Lane | Steps it owns, in order | Hands off to |
|---|---|---|
| Basis | Implement notes 2399707 and 2502552, then run the SI-Check | Functional lead |
| Functional lead | Assign each relevant item and define the process change | Developer |
| Developer | Remediate the custom code and configuration findings | Test lead |
| Test lead | Write the test case and execute it in the mock conversion | Business owner |
| Business owner | Approve the exemption, or accept the closed item | Test lead files the evidence |
For SAP's own description of the Simplification Item Catalog and how it sits beside the other tools, see the SAP Learning course on key functional topics in a system conversion. For the test design side, the change impact analysis course shows how to move from a change record to a test scope.
11. Upgrades after go-live: the catalog does not stop at conversion
Conversion is the first gate, not the last. Each S/4HANA release-to-release upgrade brings its own items. SAP describes the SI-Check as the step that identifies the simplification items relevant for your system upgrade, and SUM calls it. With every feature package different modules and processes are being renewed, resulting in a (small) number of new simplification items you have to cope with. A small number still needs an owner, a test and evidence.
Treat each upgrade as a new SI-Check cycle. Run the check against the target release, sort the relevant items with the same buckets as in Section 8, and feed them into the regression program. The regression pack should know which process each new item touches, so the team does not rediscover it at go-live. The guide to upgrade cadence and regression sets out the regression approach, and the FPS02 regression note shows what a single feature pack update asks you to test.
Keep the release calendar and the regression plan in the same place. Use the Release Regression Plan to record which items came in with each upgrade, which test cases cover them and who signed. Public Edition upgrades follow a different cadence, so the regression plan for a cloud tenant should be set up separately; the course on Public Edition release upgrades covers that path.
12. Common mistakes and how to avoid them
- Running the check once. A result is only as good as the data and content it used. All the checks are based on t-code ST03N data. The check result would not be correct if there is no ST03N data. Confirm the data is in place before you treat a result as final, then re-run the check when the freeze changes.
- Ignoring yellow items. A yellow item is a warning, not a pass. In the relevance view, the yellow triangle means it is probably relevant, so read the item before you move on.
- Exempting without business sign-off. The report's exemption shows items that have errors can be exempted. That option is the start of the decision, not the end. Use the decision path in Figure 5.
- Relying on a stale PDF. A 2025 PDF exists for Feature Pack Stack 1 and SAP S/4HANA Cloud, but SAP's own statement is that the catalog is the source for up-to-date content. Work from the catalog file you saved for the project, and check the release on every page you cite.
- Mixing catalog versions across systems. Keep one catalog version for the whole freeze. After a conversion, SAP guidance from earlier releases recommended freezing the simplification catalogs for later conversions in the landscape. After successful conversion it is recommended to freeze the simplification catalogs for subsequent conversions in the landscape for Quality and Production. Record which version each system used.
- Treating the note version as fixed. The minimum version of 2399707 and 2502552 depends on the target release, and the notes change. If you have implemented the latest version of note 2399707, version 185 then please fetch the latest content of simplification items from simplification item catalogue (SIC) by pressing the same button or manually upload the latest content. Check the version in SNOTE on the day you start the freeze.
- Is the item relevant, and does the consistency check show an error you can fix in the project window?Yes → fix it, then re-run that single item · No → go to the next question
- Is the Exemption Possible column set for this item?Yes → go to the next question · No → keep the item open and escalate to Basis and the SUM lead
- Has the business owner read the item and accepted the process impact?Yes → record the exemption with the date, the approver and the note reference, then add the item to test scope · No → do not exempt; keep the item open
- Is there a process test case with evidence for the change?Yes → close the item · No → write the test case and run it before you close
13. Checklist and templates
Use these checks before the freeze, before SUM runs, and before the business signs.
- The catalog file is saved with the release name and the date, and every system in the project uses it.
- Notes 2399707 and 2502552 are at the version your target release needs, and the TCI prerequisites are in place in every system.
- The stack file from the Maintenance Planner matches the target you plan to reach.
- ST03N data is present in the source system before the check runs.
- Every relevant item has a bucket, an owner, a due date and a risk rating.
- Every red or yellow item has a fix, or an exemption with business approval.
- Every relevant item maps to a test case, a data variant and evidence.
- The SI-Check and the custom code results are reconciled in one register.
Start with the Simplification Item Test Impact Tracker for the item-to-test mapping, and the S/4HANA Migration Readiness Checklist for the wider gate. The Change Impact Analysis Log works well for items that change a process but not code.
The bottom line
The simplification item catalog tells you what changes. The SI-Check tells you which changes apply to your system and whether the technical consistency holds. Neither one tells you that a business process works after conversion. Give every relevant item an owner, a decision and a test, and keep the evidence signed. That is the difference between a check that passed and a cutover you can defend.
Frequently asked questions
What is a simplification item in SAP?
A simplification item documents a change between an SAP Business Suite or ECC source and an S/4HANA target. Each simplification item details the steps that need to be taken for the conversion from a business and a technical point of view, both preparatory and follow-on steps and each item is available as a SAP Note. Treat each one as a process change to assess, not a technical footnote.
What is the simplification item check in SAP, and which report runs it?
The Simplification Item Check (SI-Check) is run with the report /SDF/RC_START_CHECK, which you start from transaction SA38. The Simplification Item-Check (SI-Check) is called by the Software Update Manager (SUM) tool and it identifies the simplification items relevant for your system upgrade. Run it yourself during the build, and expect SUM to run it again before downtime.
Is there a SAP simplification list PDF for S/4HANA 2025?
SAP still publishes a PDF, and the 2025 version covers Feature Pack Stack 1 and SAP S/4HANA Cloud. Check the release on the cover before you use it for scoping. SAP recommends the online catalog for current content, and the PDF is still available, but we recommend using the catalog.
Where do I find the Simplification Item Catalog?
The SAP Support Launchpad hosts it at the /sic/ path, and access requires an S-user. SAP's guides also point to https://me.sap.com/sic for the same content. Confirm the target release in the list before you download, and save the file you used.
What is the difference between the SAP Readiness Check and the Simplification Item Check?
The Readiness Check is a planning tool for scope, sizing and work packages. The SI-Check is the technical gate that runs in the source system and again inside SUM. Use the Readiness Check early, and use the SI-Check in the build and the freeze. Both are required, so neither one replaces the other.
How do I run the simplification item check in SAP?
Implement notes 2399707 and 2502552 in the backend system, enable TCI in every system, run the Maintenance Planner for the stack file, and then start /SDF/RC_START_CHECK in SA38. Run the relevance check first, and then use the consistency check for the relevant items. Section 5 covers the steps in order, and the course on simplification items and the SI-Check walks through them on a system.
Can I ignore or exempt a simplification item check error?
You can exempt an item only where the report allows it, and only with a named business owner's approval and a test case for the process change. Ignoring a red item is not an option, because it blocks the conversion path. Yellow items need a read-through before you close them. Record the date, the approver and the note reference for every exemption.
How many simplification items will affect my system?
No reliable number exists outside your own system, because the answer depends on the source release, the target release and the modules and data you use. The catalog contains all the simplification items, not only those that are relevant for your upgrade project. Run the relevance check on your system and count the relevant items from that result, not from a published total.
Sources
- Simplification Item Catalog, SAP Support Launchpad, SAP SE, current
- Conversion Guide for SAP S/4HANA 2025, Document Version 3.0, SAP SE (SAP Help Portal), 2026-10-07
- Upgrade Guide for SAP S/4HANA Cloud Private Edition 2025, Document Version 3.0, SAP SE (SAP Help Portal)
- Upgrade Guide for SAP S/4HANA 2025, Document Version 3.0, SAP SE (SAP Help Portal)
- Simplification List for SAP S/4HANA 2025 – Feature Pack Stack 1 and SAP S/4HANA Cloud, SAP SE (SAP Help Portal)
- Simplification List for SAP S/4HANA 2023, white paper, SAP SE (SAP Help Portal), 2025-02-25
- Getting Started With SAP S/4HANA 2025, Document Version 3.0, SAP SE (SAP Help Portal)
- SAP Note 2399707, Simplification Item Check, SAP SE (SAP for Me / Support Portal)
- SAP Note 2502552, S4TC – SAP S/4HANA Conversion & Upgrade new Simplification Item Checks, SAP SE (SAP for Me / Support Portal)
- Key Functional Topics in a System Conversion to SAP S/4HANA, SAP Learning
- SAP Note Simplification Item Check implementation problems, SAP Community blog
- Compatibility Pack: How to check it in your system going forward?, SAP Community
- S/4HANA Conversion – t4 – Simplification Item Check, step by step, SAP Community blog, 2020
- SAP S/4HANA Simplification Item Check – How to do it right, SAP Community blog
- Questions about the Conversion & Upgrade new Simplification Item Checks, SAP Community Q&A
- SAP Readiness Check for SAP S/4HANA upgrades, SAP Community blog
- Conversion to S/4HANA 1809FPS0 – t4 – Simplification Item Check, SAP Community blog, 2018
- S4HANA upgrade preparation steps for simplification items, third-party how-to, older; verify against the current note
Free S/4HANA testing templates
Master test strategy, migration test plan, cutover runbook, go/no-go checklist and more.
The RISE Testing Playbook
One practical move a week for testing your ECC to S/4HANA transformation.
How this guide is made: researched with AI-assisted search across SAP documentation and practitioner sources, with every fact linked to its source. Found an error or have field experience to add? Tell us.