Integration and End-to-End Testing of SAP Business Processes
Course quiz
Integration and End-to-End Testing of SAP Business Processes
Keep this: job aid
End-to-end test checkpoint card
- Tag every test case with its level and cycle (unit, string, SIT1-3, E2E).
- Select end-to-end scenarios by impact, likelihood and volume; cover step-level variants lower down.
- One checkpoint per boundary: document created, message processed, posting reconciled.
- IDocs: WE02 / WE05 to display, BD87 for the status monitor. Pass means the business document exists.
- AIF: /AIF/ERR and /AIF/IFMON. Integration Suite: Monitor, Integrations and APIs. Cross-component: Cloud ALM Integration & Exception Monitoring.
- Run book per scenario: named owner, time, batch jobs, checkpoint, next owner. Shared data sheet for live document numbers.
- Blocked? Keep downstream steps moving on prepared data, and mark the chain incomplete.
- Localize top-down: last good checkpoint, document flow, interface monitors, then logs (SLG1, job logs, ST22).
- Evidence pack: document and message numbers with statuses, reconciliation, deviations with defect IDs.
- Before sign-off, list unrun scenarios, bypassed boundaries and accepted defects with owners and dates.