Now accepting guest editorial from SAP, Oracle, Workday and ServiceNow practitioners.Pitch a guide
The Sign-Off Table
Make-to-Order and Variant Manufacturing Scenarios

Course quiz

Make-to-Order and Variant Manufacturing Scenarios

Keep this: job aid

Make-to-order card

  • Strategy 20: each sales order planned separately, lot-for-lot, no netting.
  • Check strategy group (MRP view), requirement type and item category first.
  • MD04: one segment per sales order item; production order account-assigned to the item.
  • Sales order stock = special stock E: receipt 101 E, delivery 601 E.
  • Leftover stock: 411 E to own stock, 413 to another item; check value effect.
  • Valuated: receipt with value, order settles to material. Non-valuated: costs on the item.
  • Configurable: characteristics, class, dependencies, super BOM/routing; test values both ways.
  • Diagnose forward along the chain; the first wrong object is usually the cause.
  • Evidence: special stock E segment, order costs and settlement, margin for the item.
  • VC engines: LO-VC (CU41/CU50) remains in Private Edition, not compatibility scope; AVC is the newer engine and the only one in Public Edition.
  • MRP Live plans MTO items; MD50/MD51 run classic logic (Note 1914010).