Production Orders: From Release to Goods Receipt
Course quiz
Production Orders: From Release to Goods Receipt
Keep this: job aid
Production order lifecycle card
- Convert: CO40 (one), CO41 (many), partial conversion, or create manually with CO01.
- Before release, check production version, components, operations and dates.
- Release: CRTD → REL; nothing posts before it. Check MSPT and the missing-parts log.
- Goods issue: 261 (reverse 262); backflush posts at confirmation of the consuming operation.
- Check COGI daily: failed backflushes leave stock on the books.
- Confirm: CO11N per operation; PCNF partial, CNF final; cancel with CO13.
- Activities post cost from the work center cost center to the order at activity rates.
- Goods receipt: 101 (reverse 102); at standard price, differences become variance.
- TECO deletes reservations and capacity requirements; late postings still possible.
- Evidence: status history, material documents, journal entries, reconciliation to order costs.