Now accepting guest editorial from SAP, Oracle, Workday and ServiceNow practitioners.Pitch a guide
The Sign-Off Table
Production Orders: From Release to Goods Receipt

Course quiz

Production Orders: From Release to Goods Receipt

Keep this: job aid

Production order lifecycle card

  • Convert: CO40 (one), CO41 (many), partial conversion, or create manually with CO01.
  • Before release, check production version, components, operations and dates.
  • Release: CRTD → REL; nothing posts before it. Check MSPT and the missing-parts log.
  • Goods issue: 261 (reverse 262); backflush posts at confirmation of the consuming operation.
  • Check COGI daily: failed backflushes leave stock on the books.
  • Confirm: CO11N per operation; PCNF partial, CNF final; cancel with CO13.
  • Activities post cost from the work center cost center to the order at activity rates.
  • Goods receipt: 101 (reverse 102); at standard price, differences become variance.
  • TECO deletes reservations and capacity requirements; late postings still possible.
  • Evidence: status history, material documents, journal entries, reconciliation to order costs.