Production Master Data: BOMs, Work Centers and Routings
Course quiz
Production Master Data: BOMs, Work Centers and Routings
Keep this: job aid
Production master data checklist
- Product per plant: MRP type, MRP controller, lot size, procurement type, lead times, safety stock, strategy group.
- BOM (CS01–CS03): right plant, production usage, base quantity, item categories, validity and change numbers.
- Work center (CR01–CR03): standard value key, formulas, capacity, one cost center, activity types.
- Activity prices planned in controlling for every cost center, activity type and fiscal year.
- Routing (CA01–CA03): operations, work centers, control keys, standard values, component allocation.
- Production version (MRP 4, C223 or Fiori): BOM alternative + routing, lot size range, validity; consistency check passed.
- Probe order: expected components, operations, dates and costs written first.
- Cost estimate: itemization traced to BOM and routing; costing log cleared; result near expected standard.
- Negative probes: quantity outside every version, order dated before a component change.