Now accepting guest editorial from SAP, Oracle, Workday and ServiceNow practitioners.Pitch a guide
The Sign-Off Table
Selective Data Transition Concepts

Course quiz

Selective Data Transition Concepts

Keep this: job aid

Selective data transition fit card

  • Three paths: new implementation, system conversion, selective data transition in between.
  • SDT selects four layers independently: ABAP repository, configuration, master data, transaction data.
  • Shell conversion: copy production without business data, convert it, then transfer data. Best when most processes are reused.
  • Mix and match: install new, bring selected configuration and code. Best when most of the solution is redesigned.
  • Scope by organization, application, master data filter and time slice; write down every decision and its owner.
  • Time slices need document-chain rules and correct opening balances.
  • Shell conversion means retrofit: log and retest every production change until cutover.
  • Reconcile against the selection: everything inside arrived, nothing outside arrived, all consistent.
  • Test that history is usable: reports, document flow, returns and credit memos on transferred documents.
  • Public Edition moves are normally new implementations; confirm before planning SDT.