Material Ledger and Actual Costing
Course quiz
Material Ledger and Actual Costing
Keep this: job aid
Material ledger and actual costing cheat sheet
- Ledger: always active in S/4HANA. Actual costing: optional, per plant, a design decision.
- Price control S or V is unchanged; price determination 2 = transaction-based, 3 = actual costing.
- Currencies: up to three, translated at historical rates; define them explicitly in the ML type (OMX2/OMX3).
- Views: legal, group, profit center. Activate only what you will report and test.
- Run (CKMLCP): Selection, Preparation, Settlement, Post closing, optional Mark prices. Closed period only.
- Error list: every run has a named owner; unsettled components block the levels above.
- Analysis (CKM3): beginning, receipts, cumulative, consumption, ending. Trace total → process → document → owner.
- Tests: expected PUP and distributions on paper first; sample high-value and multilevel materials.
- Exit: ledger vs G/L inventory per plant, account and currency reconciles, every difference explained.
- Conversion: finish all costing runs first; compare stock values with the pre-conversion extract.