Now accepting guest editorial from SAP, Oracle, Workday and ServiceNow practitioners.Pitch a guide
The Sign-Off Table
High Availability, Backup and Disaster Recovery for SAP Landscapes

Course quiz

High Availability, Backup and Disaster Recovery for SAP Landscapes

Keep this: job aid

HA, backup and DR sign-off card

  • HA = component failure nearby, near-zero loss. DR = site or region lost, some loss accepted. Backups = logical errors and corruption.
  • Single points of failure: ASCS (cluster with ERS), application servers (N+1), SAP HANA (system replication), storage and network.
  • HSR modes: SYNC (secondary disk), SYNCMEM (secondary memory), ASYNC (no wait). logreplay = hot standby; logreplay_readaccess = read-enabled.
  • Takeover moves the database role; applications, virtual names and interfaces must follow.
  • RPO = point to which data must be recovered; RTO = tolerable time in recovery (NIST SP 800-34). Set them per process with owners.
  • Check targets against the RISE contract: HA standby if contracted; DR optional; customer DR procedures are the customer's.
  • DR test under RISE: SAP executes failover on request (one per year included in the optional service); customer runs functional tests; test postings are lost.
  • Success criteria: time, data (known last transaction), processes, interfaces, output, jobs; record timestamps.
  • Report: verdict, targets versus achieved, timeline, findings with owner and date, evidence.
  • Sign-off: Basis, test lead, process owners, program lead; retest on a cycle and after major changes.