Now accepting guest editorial from SAP, Oracle, Workday and ServiceNow practitioners.Pitch a guide
The Sign-Off Table
Upgrades and Conversions with Software Update Manager (SUM)

Course quiz

Upgrades and Conversions with Software Update Manager (SUM)

Keep this: job aid

SUM conversion checklist for Basis

  • Use SUM 2.0 for any SAP S/4HANA target; download the latest SP and read its central SAP Note.
  • Inputs: stack.xml from the Maintenance Planner, the download basket, target kernels and HANA client for DMO, transports from earlier runs.
  • Prerequisites: Unicode, AS ABAP only, supported start release (2025: SAP Notes 3549655 and 3493301), SI-Check errors at return code 8+ resolved.
  • Roadmap: Extraction, Configuration, Checks, Preprocessing (shadow, SPDD), Execution (downtime), Postprocessing.
  • Freeze development and transports once the shadow repository is being built.
  • Budget business downtime: ramp-down, SUM, technical and application follow-ups, validation, ramp-up, contingency.
  • Keep logs, phase durations and DMO duration files from every run; change one big thing at a time.
  • Freeze the SUM version for the dress rehearsal and production.
  • Before handover: SPAU and SPAU_ENH, SDM_MON, ST22 and SM21, SM37, SM59, ATC S4HANA_READINESS, Fiori and output smoke test.
  • Hand over each run with a note; record the run number in all test evidence.